3. VACUUM/POWER STATION:
Position power station for easy access to the filter compartment and controller.
Consider the following:
a. 1 HP units:
1 HP units require a STRONG 120 volt power source. DO NOT use an
extension cord, unless it is 12 gauge or better. Be sure the outlet is rated for 20
amps minimum.
On startup, the blower requires a surge of over 40 amps and should be able to
pull this high current to start properly. If supply wire size is not adequate, the
blower will be unable to pull full startup amperage. The higher the initial amp
draw, the faster the motor reaches full speed and, subsequently, the cooler it
runs.
If the blower does not come up to full speed within 6 seconds power supply is not
as strong as it should be.
Slow starting may be OK, depending on the duty cycle of the blower. 120 volt
single phase blower motors have automatic overheat protection and will stop
operating if they become too hot due to an inadequate power supply. If you
experience this problem, read SETUP OPTIONS, Routine 5.
b. 2.5, 5 and 10 HP units:
These units require 3 phase current. 2.5 and 5 HP are 230 or 460 volt. 10 HP is
460 volt only. Typically 3 phase motors reach full speed in a fraction of a
second.
Unless you specified otherwise, we have wired and tested these units for 460
volt, 3 ph. If you rewire them for 230 volts, you will have to change the overload
protection heaters in the motor starter for higher amp draw.
4. CONTROLLER:
Place the controller in the tray provided on top of the Filter/Power station. Secure the
controller with the screw provided in the back of the tray. Hand tighten only.
Plug the CONTROLLER into the 120 volt outlet on the back of the Filter/Power station.
A single controller controls 8 stations. There is a Dual Controller
Option that uses two controllers (Main and Follower) to control up to
a maximum of 16 stations.
Содержание MLS Clear Vu
Страница 2: ...Maguire Products Inc 2 MLS Clear Vu...
Страница 9: ...Maguire Products Inc 9 MLS Clear Vu...
Страница 10: ...Maguire Products Inc 10 MLS Clear Vu...
Страница 11: ...Maguire Products Inc 11 MLS Clear Vu...
Страница 12: ...Maguire Products Inc 12 MLS Clear Vu...
Страница 25: ...Maguire Products Inc 25 MLS Clear Vu MLS Alarm Lights Explained...
Страница 35: ...Maguire Products Inc 35 MLS Clear Vu...
Страница 36: ...Maguire Products Inc 36 MLS Clear Vu...
Страница 37: ...Maguire Products Inc 37 MLS Clear Vu...