9
INSTALLATION INSTRUCTIONS
BURNISHING CLUTCH
NEVER PERFORM THE BURNISHING
PROCEDURE WHILE DRIVE IS LOADED.
WARNING!
WARNING!
BURNISHING PROCEDURE MUST BE DONE
BEFORE INSTALLATION, WHEN FULL TORQUE
IS IMMEDIATELY REQUIRED FROM THE
CLUTCH!
Clutch pre-run setup
Clutches must be burnished before operation. We recommend the clutches to be engaged / disengaged
a few time to break them in before being placed under load.
1. Rotate the clutch and check for rubbing or interference.
2. Reinstall the belt/chain, do not over tighten.
3. Run the engine at 50% throttle.
4. Engage and disengage the clutch 25 times, 10 seconds “ON” and 10 seconds “OFF”.
5. Run the engine at 75% throttle.
6. Engage and disengage the clutch 25 times, 10 seconds “ON” and 10 seconds “OFF”.
Magnum recommends 15-20 ft-lbs of torque on pulley assembly screws (5/16-18UNC) and 20-30 ft-lbs of
torque on shaft fixing screw.
WARNING!
DURING SPREADER OPERATION, IF CON-
VEYOR FREEZES UP - THE CLUTCH SHOULD
IMMEDIATELY BE DISENGAGED.
NEVER USE THE CLUTCH TO “FREE UP” THE
CONVEYOR.
WARNING!
Содержание V-BOX PV Series
Страница 28: ...28 SUPERIOR GEARBOX ASSEMBLY ...
Страница 32: ...32 ...
Страница 38: ...38 CONTROL BOX OPTIONAL ...
Страница 40: ...40 2 3 1 22 ...
Страница 43: ...43 ...
Страница 44: ...44 ...
Страница 45: ...45 ...
Страница 46: ...46 NAME PLATE INFORMATION ...
Страница 47: ...47 ...