35
mTripod
Installation and assembly
7.4.4
Foundation and empty conduit plan and reinforcement mTripod
FMTP-ML
3
1
2
4
4
5
10
0
20
02
00
56
0
56
0
(1300)
1350
400
40
80
80
117.
51
17.5
10
22.5
45
8.5
1
800
(180)
Mag
00813b
Fig. 6:
mTripod FMTP-ML foundation and empty conduit plan (dimensions in mm)
1 Foundation, frost depth, outdoor area
2 Outline mTripod FMTP-ML
3 Boreholes (8 x)
4 Feed-through for empty conduits
5 Passage side, side of the locking arms
Содержание MHTM FlowMotion mTripod
Страница 6: ...6 mTripod...
Страница 78: ...78 mTripod...
Страница 81: ...81 mTripod...
Страница 82: ...82 mTripod...
Страница 83: ...83 mTripod...