Magic-Pak V Series Скачать руководство пользователя страница 12

Page 12 of 21

507389-01

Issue 1504

To Shut Down Main Burners

1.  Turn off electrical power to unit.

2.  Move the ON/OFF switch to the “OFF” position 
        (see Figure 6).

OPERATION

Operation of the unit is automatic and will provide heating and 

cooling depending on the setting of the thermostat.

Heating

1.  Turn on main power supply.

2.  Open manual gas shutoff valve.

3.  Set thermostat system to “HEAT”.

4.  Set thermostat to temperature desired.

Cooling

1.     Turn on main power supply.

2.  Set thermostat system switch to “COOL”.

3.  Set thermostat to temperature desired.

Heating Sequence of Operation

1.  Thermostat calls for heat.

2.  Combustion blower starts and proper air flow is proven by 

the pressure switch closing.

3.  Blower continues to operate for 30 seconds prior to the 

burners lighting.

4.  Ignition  control  begins  spark  and  opens  gas  valve.    The 

burners are lit. Ignition is proved through the flame sensor.

5.  Circulating air blower starts 30 seconds after the burners 

light.

6.  When the thermostat is satisfied, the burners and combustion 

blower shut off.

7.  Circulating air blower will shut off 120 seconds later.

If the burners should fail to ignite, the ignition control will try to 

ignite the burners a total of three times.  Should the burners fail 

to ignite within the three trials for ignition, the ignition control 

will lock out for 1 hour before beginning another ignition cycle.  

To reset the control, turn the thermostat down or off for 10 

seconds and then set to desired setting.  At this time, the ignition 

sequence will try again.

Blower Control

The  blower  will  start  approximately  30  seconds  after  the 

burners ignite and will stop approximately 120 seconds after the 

thermostat is satisfied.  The time delay is preset at the factory 

and timing can not be adjusted.

Cooling sequnce of Operation

When the thermostat system switch is set for “COOL”, the blower 

will start 5 seconds after the thermostat calls for cooling and will 

stop 90 seconds after the thermostat is satisfied.

Continous fan Operation

Continuous operation of the air handling blower will be obtained 

if the thermostat fan switch is set to “ON”.  With the thermostat 

fan  switch  set  to  “AUTO”,  the  air  handling  blower  will  cycle 

corresponding with the thermostat cycling.

To Shut Down Unit

For temporary or short periods of shutdown, set the thermostat 

system switch to “OFF”.  For a prolonged period of shutdown, set 

the thermostat system switch to “OFF” and turn off the electrical 

power supply and the gas supply to the unit.

Gas Valve

Figure 6

Gas Inlet

ON/OFF 

SWITCH

Gas Inlet

Pressure

test tap

Regulator

adjustment 

Screw

(Under Cap)

Gas manifold

Pressure test

tap

MAINTENANCE

ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD

Failure to follow safety warnings exactly could result in 

dangerous operation, Serious injury, death or property 

damage.

Improper servicing could result in dangereous operation, 

Serious injury, death or property damage

  Before servicing. disconnect all electrical power to 

furnace

  When servicing controls, label all wires prior to 

disconnecting reconnect wires correctly.

  Any  disassembly  of  components  containing  flue 

or  vent gases shall be done by a qualified service 

agency.

  Verify proper operation after servicing.

 

 WARNING

Содержание V Series

Страница 1: ...not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance Such actions could result in property damage personal injury or death WARNING Installati...

Страница 2: ...nit must be permanently installed per these installation instructions A room thermostat must control the furnace The use of fixed jumpers that will provide continuous heating is not allowed The return...

Страница 3: ...s must be installed in the system and must be maintained during construction Air filters must be replaced upon construction completion The input rate and temperature rise must be set per the furnace r...

Страница 4: ...Be certain that the plastic drain tube has free drainage and is not crimped or flattened at any bend Installing Without a Wall Sleeve Refer to the following directions and Figure 1 for guidance in in...

Страница 5: ...ent weld piping to street elbow Furnace condensate drain component locations Side exit Condensate Trap Side panel Upper Drain hose From Collector box Lower drain hose To drain fitting reposition and r...

Страница 6: ...ecuring the drain fitting to the division panel 3 Remove the drain fitting and rotate it so that it faces the front of the furnace 4 Replace the securing screw 5 Disconnect lower drain hose from drain...

Страница 7: ...ps for each appliance connected to the common venting system 7 After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined...

Страница 8: ...dition for installations in Canada See rating plate for correct wire ampacity for the cooling chassis required and size wire accordingly The furnace must be isolated from the gas supply piping system...

Страница 9: ...sure vary more than 0 3 W C for natural gas or 0 7 W C for propane To adjust the regulator turn the adjusting screw on the regulator clockwise to increase pressure and input or counterclockwise to dec...

Страница 10: ...835 34 TAP 4 COOL 208 or 230 800 775 755 735 TAP 5 COOL 208 or 230 880 860 835 815 TAP 1 HEAT 208 or 230 645 59 615 62 590 65 565 N A TAP 2 HEAT 208 or 230 780 49 755 51 730 52 710 54 TAP 3 HEAT 208 o...

Страница 11: ...could result in safety shutdown of the burners 1 Adjust to the highest achievable temperature rise within the rise and static pressure ranges specified on the rating plate Depending on specific model...

Страница 12: ...nce will try again Blower Control The blower will start approximately 30 seconds after the burners ignite and will stop approximately 120 seconds after the thermostat is satisfied The time delay is pr...

Страница 13: ...rnace be inspected annually by a qualified service person Inducer prover switch Ignition Control board Remove these screws to remove Burner Assembly Igniter Combustion Inducer Gas Valve Gas Manifold R...

Страница 14: ...efer to Figure 8 Remove the two screws on the burner assembly that secure it to the mounting brackets The mounting brackets contain pins to locate the assembly and hold it in place after the screws ar...

Страница 15: ...Page 15 of 21 507389 01 Issue 1504 BURNER MANIFOLD ASSEMBLY REMOVAL Step 7 Mounting Brackets Step 8 Step 9 Step 10 Burner Manifold Assembly Figure 8...

Страница 16: ...t without removing any other components To remove the rollout switch 1 Disconnect electrical service and turn off gas to the appliance 2 Disconnect the orange leads at the rollout switch 3 Remove the...

Страница 17: ...Page 17 of 21 507389 01 Issue 1504 Ignition board Bracket removal Tabs on Cold End Header box Figure 9 Press down on locking tab then slide bracket Slots on ignition board bracket...

Страница 18: ...e unit carefully pry the round portion of the orifice from the inducer inlet 3 Remove the indicator tab from the inducer mounting foot Model Orifice color HWC9N22 Blue HWC9N33 Black HWC9N44 Gray HWC9N...

Страница 19: ...assis normally requires no maintenance since it is a closed self contained system System is charged with R410A refrigerant Periodic maintenance is limited to Cleaning the air filter Follow directions...

Страница 20: ...Page 20 of 21 507389 01 Issue 1504 Figure 11...

Страница 21: ...Page 21 of 21 507389 01 Issue 1504 NOTES...

Отзывы: