![Madur GA-21 Plus Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/madur/ga-21-plus/ga-21-plus_operating-manual_688625055.webp)
www.madur.com
Manual
GA-21Plus
Starting the continuous storing of results ( in Banks )
-
call the STORE menu
check whether enough free memory is available for the measurement. If not, one
or more banks must be erased. The option
DELETE
ALL BANKS
can be used.
and
-
move the cursor to the option
BANKS
-
open the option
BANKS
and
-
move the cursor to the line
STORAGE
Set or check the
averaging time
.
-
start the storing, the word
ACTIVE
appears
-
the measured/calculated values are shown, storage
is active
Stopping the continuous storing of results
-
call the STORE menu
and
-
move the cursor to the option
BANKS
-
open the option
BANKS
and
-
move the cursor to the line
STORE
55
Содержание GA-21 Plus
Страница 1: ...FLUE GAS ANALYSER GA 21 plus Operating manual Version 2 1 06 2017 ...
Страница 15: ...www madur com Manual GA 21Plus Picture 2 Front elevation picture 15 ...
Страница 44: ...www madur com Manual GA 21Plus 44 ...
Страница 52: ...www madur com Manual GA 21Plus 52 ...
Страница 60: ...www madur com Manual GA 21Plus 60 ...