![Maddox M5GABS Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/maddox/m5gabs/m5gabs_owners-manual-and-safety-instructions_3307836007.webp)
Page 7
For technical questions, please call 1-888-866-5797.
Item 58814
SA
FE
TY
OP
ERA
TI
O
N
MAINT
ENANC
E
IN
ST
ALLA
TI
O
N
Operating Instructions
Read the ENTIRE IMPORTANT SAFETY INFORMATION section at the beginning of this
manual including all text under subheadings therein before set up or use of this product.
Tire Area Set Up
1. Designate a work area that is clean and well-lit.
The work area must not allow access by
children or pets to prevent injury.
2. Secure tire and rim in place on a flat level
surface before attempting to seat tire bead.
General Operation
WARNING! TO PREVENT SERIOUS
INJURY AND DEATH FROM
EXPLOSION:
Do not fill Bead Seater beyond 120 psi.
1. Close Discharge Valve (11).
2. Open Fill Valve (8).
3. Connect air hose to Quick Coupler (9).
4. Turn on air compressor (not included)
and adjust to appropriate psi.
CAUTION!:
To prevent damage to tire and rim do not
put more than 40 psi into tire while seating bead.
5. Fill Bead Seater Tank (1) to appropriate
psi for tire, but do not exceed 120 psi.
6. Close Fill Valve.
7. Disconnect air hose.
8. Turn off air compressor.
9. Clean bead mating surfaces on tire and rim.
Note:
Inspect rim for cracks and corrosion. If
found, clean and replace as necessary.
10. Mix bead lubricant (not included) properly
to ensure correct bead seating.
11. Apply lubricant to bead mating surface on tire.
12. Ensure tire and rim are secured on a
flat level surface. The tire and rim may
move suddenly while seating them.
13. Use appropriate fitting to connect air hose to tire
valve stem so that air flows into valve stem.
14. Turn on air compressor.
15. Adjust air compressor to proper psi for tire inflation.
WARNING!
TO PREVENT SERIOUS INJURY:
Wear ANSI-approved safety goggles,
heavy-duty work gloves and hearing protection.
16. Hook Bead Seater Nozzle (13) Lip on rim.
17. Firmly grip handle and Discharge Valve.
WARNING! TO PREVENT SERIOUS INJURY:
Keep hands away from tire and rim mating area.
18. Rapidly open Discharge Valve.
19. Close Discharge Valve. Check to see
that tire is properly seated to rim. Repeat
steps 1 through 18 if necessary.
20. Allow tire to fill to appropriate psi with air hose.
21. Remove air hose from tire valve stem.
22. Turn off air compressor.
23. Open Discharge Valve on Bead Seater.
24. Point Nozzle down to allow moisture drainage.
25. Close Discharge Valve.