OPERATION
Form # 169089
19
Model Year - 2010
g. At the header, disconnect electrical connector by
turning collar counterclockwise and pulling
connector to disengage.
h. Disconnect the two drive couplers, and case
drain coupler on header.
i. Move hose bundle from header and locate on
windrower LH side with hoses in support (D).
j. Rotate lever (A) clockwise and push to engage
bracket.
k. Locate electrical harness through support (D)
and attach cap to electrical connector (E).
l. Move windrower platform back to closed
position.
m. Detach header from windrower. Refer to the
M150 & M200 Self-Propelled Windrower
Operator’s Manual for procedures for
mechanically detaching the header from the self-
propelled windrower.
6.4.2 M150 – 13 FT
a. Move LH (cab forward) platform to rear of
windrower.
b. Disconnect the hydraulic coupler from windrower
valve.
c. Raise lever (A) and undo Velcro straps (B).
d. Move hose (C) to store on header.
e. Install caps on connectors and hose end if
equipped.
f.
At the header, disconnect electrical connector by
turning collar counterclockwise and pulling
connector to disengage.
(continued next page)
C
A
B
A
D
E
ELECTRICAL
CASE DRAIN
PRESSURE
RETURN