OPERATION
Form # 169089
14
Model Year - 2010
6.3 HEADER
ATTACHMENT
Refer to the M150 & M200 Self-Propelled
Windrower Operator’s Manual for procedures for
mechanically attaching the disc header to the
self-propelled windrower. Refer to the following
procedures for electrical and hydraulic
connections. The header drive hydraulic hoses
and electrical harness are located on the left
cab-forward side of the windrower.
6.3.1 M200 – 13 FT & 16 FT
6.3.1.1 WINDROWER
CONNECTIONS
a. Disengage and rotate lever (A) counter-
clockwise to fully up position.
b. Remove cap (B) securing electrical connector to
frame.
c. Move hose bundle (C) from windrower, and rest
bundle on to header.
d. Check that hose support is positioned so that
lower bolt is in forward hole and support is
positioned as shown. Loosen bolts and adjust
as required.
e. Route hose bundle (C) from windrower through
support (D) on header.
f. Route header return and pressure hose bundle
(E) through support (D) on header, to windrower.
g. If grass seed header is being attached, route
converging drum hose bundle through header
support (D) to windrower, and locate bundle
above existing hose bundles.
h. Lower and lock lever (A).
i.
Secure hose bundles with three cinch straps (F).
(continued next page)
A
C
B
C
16 FT SHOWN – 13 FT SIMILAR
E
C
D
F
A