HEADER OPERATION - D SERIES
Form 169017 / 169087 / 169095
91
Revision C
k. Remove pin from storage position (N) in linkage,
and insert in hole (O) to engage float springs.
Secure with hairpin.
l. Disengage lift cylinder stops. Refer to Section
6.4.1
Header Lift Cylinder Stops.
m. Start engine, and activate header lift cylinders
(switch on GSL) to lower header fully.
n. Stop engine, and remove key.
o. Connect header drive hoses (P) and electrical
harness (Q) to header. Refer to the Draper
Header Operator’s Manual.
p. Connect reel hydraulics (R) at RH side of
windrower. Refer to the Draper Header Operator’s
Manual.
6.5.2 HEADER
DETACHMENT
a. Raise the header fully with the header up switch
on the GSL. Stop engine, and remove key.
DANGER
To avoid bodily injury from fall of raised
header, always engage header lift cylinder
stops when working on or around raised
header.
b. Engage lift cylinder stops on both lift cylinders.
Refer to Section 6.4.1
Header Lift Cylinder Stops
.
c. Remove pin (A) from header leg on both sides.
d. Lower header stand (B) by pulling spring loaded
pin (C). Release pin to lock stand.
(continued next page)
C
A
B
R
REEL HYDRAULICS
Q
P
HEADER DRIVE HOSES
N
O
HEADER UP
HEADER TILT UP
HEADER DOWN
HEADER
TILT DOWN