215634
90
Revision B
Walking beam signal light placard
A
C
B
1036952
Figure 3.102: Walking Beam Signal Light Placard in
–
Right Cab-Forward
8.
Install mount (A) to walking beam (B) using bolts (C) and
nuts. Ensure the mount face is parallel to the walking beam
and is positioned as far away from the walking beam as
possible to ensure clearance to the shimmy shock mounts.
NOTE:
Make sure the heads of bolts (C) are on the bottom side of
mount (A).
C
C
C
1036937
A
B
C
Figure 3.103: Walking Beam Signal Light Placard
–
Right Cab-Forward
9.
Install placard (A) onto mount (B) using three M10 X 25
carriage head bolts and nuts (C). Leave the inboard nut
loose for wiring harness P-clip later.
10. Repeat Step
to Step
at the
opposite side.