UNLOADING AND ASSEMBLY
169558
Revision
D
15
STEP 2. REPOSITION RH LEG
The right leg requires repositioning from
shipping to field configuration as follows:
a. Support front of the windrower leg off the ground
with stand (or equivalent).
b. Locate jack under RH leg, and raise jack slightly
to take some weight off leg.
c. Remove two bolts, washers, and nuts from
frame.
d. Tap out the two pins with a hammer.
e. Move leg out to expose one hole.
f. Re-install pins, and secure with bolts, washers,
and nuts (not shown). Torque nuts to 100 lbf·ft
(136 N·m).
g. Lower jack, and remove it from RH leg.