215651
233
Revision B
Installing Double-Reel U-Joint
$
%
&
Figure 5.240: U-Joint
1.
Position U-joint flange (B) onto driven sprocket (C)
as shown.
2.
Apply medium-strength threadlocker (Loctite® 243 or
equivalent), and install six bolts (A). Hand-tighten the bolts;
do
NOT
torque the bolts.
NOTE:
Only four bolts (A) are shown in the illustration at right.
NOTE:
It may be necessary to move the right reel sideways so that
the U-joint can clear the reel tube.
$
%
Figure 5.241: U-Joint
3.
Position the right reel tube against the reel drive and
engage the stub shaft into the U-joint pilot hole.
4.
Rotate the reel until the holes in the end of the reel tube
and U-joint flange (B) line up.
5.
Apply medium-strength threadlocker (Loctite
®
243 or
equivalent) to four 1/2 in. bolts (A) and secure in the
flange.
6.
Torque the ten bolts to 108 Nm (80 lbf
∙
ft).
$
Figure 5.242: Supporting Reel
7.
Remove sling (A) from the reel.
8.
Install the drive cover. For instructions, refer to
.
Содержание D115X
Страница 26: ...215651 12 Revision B Figure 1 20 Backtube D115X Draper Header A MD 184422 B MD 184372 C MD 131391 SAFETY ...
Страница 27: ...215651 13 Revision B Figure 1 21 Backtube D120X Draper Header A MD 184372 B MD 166466 C MD 131391 SAFETY ...
Страница 28: ...215651 14 Revision B Figure 1 22 Backtube D125X Draper Header A MD 184372 B MD 166466 C MD 131391 SAFETY ...
Страница 38: ......
Страница 46: ......
Страница 118: ......
Страница 126: ......
Страница 256: ......
Страница 270: ......
Страница 272: ......
Страница 286: ......