214804
42
Revision A
Figure 3.40: Hose and Electrical Bundle
–
4.3 m
and 4.9 m (14 ft. and 16 ft.) Header Shown (5.5 m
[18 ft.] Header Similar)
4.
Move hose/electrical bundle (A) to header.
5.
Route bundle (A) from windrower through support (B)
and access hole (C) in header frame alongside existing
hose bundle (D) from header.
6.
Remove cover on header electrical receptacle (E).
7.
Push connector onto receptacle, and turn collar on
connector to lock it in place.
8.
Attach cover to mating cover on windrower wiring
harness.
9.
Remove caps from hydraulic couplers. Clean if
necessary.
Figure 3.41: A40D Header
–
4.3 m and 4.9 m
(14 ft. and 16 ft.) Header Shown (5.5 m [18 ft.]
Header Similar)
A - Reel Pressure
B - Knife and Conditioner Return
C - Case Drain
D - Knife and Conditioner Pressure
10. Push hose connectors onto mating receptacles as
shown until collars on receptacles snap into lock
position.
NOTE:
Hoses attached to connectors not shown in illustrations
at right.
Содержание A40-D
Страница 2: ...MacDon A40D Self Propelled Windrower Auger Header Published November 2018...
Страница 3: ...EC Declaration of Conformity Figure 1 EC Declaration of Conformity Page 1 214804 i Revision A...
Страница 4: ...Figure 2 EC Declaration of Conformity Page 2 214804 ii Revision A...
Страница 14: ......
Страница 32: ......
Страница 38: ......
Страница 127: ...214804 113 Revision A MAINTENANCE AND SERVICING...
Страница 206: ......
Страница 210: ......
Страница 212: ......