Pag.13
27/03/2014
SCHEMATIC SUMMARY OF STEAM AND COFFEE BOILER HEATING PHASE
Heating element ON
Temperature sensor
(
Please Wait )
Steam boiler
Heating element OFF
ON
Set-up ( Select Drink )
0°C
°C
Steam nozzle
solenoid valve
Solenoid valve open
ON
OFF
Solenoid valve close
50°C
95°C
°C
Milk frother
solenoid valve
Solenoid valve open
ON
OFF
Solenoid valve close
50°C
95°C
°C
Coffee group
solenoid valve
Rinsing phase
ON
OFF
50°C
°C
Temperature sensor
Heating element ON
Coffee boiler
( Please wait )
Set-up
Heating element OFF
( Select Drink )
OFF
0°C
°C
Содержание ILC-200
Страница 8: ...Pag 8 27 03 2014 ELECTRIC HYDRAULIC CONNECTION H2O IN 1 6 Bar H2O OUT WATER SOFTNER WATER FILTRE...
Страница 18: ...Pag 18 27 03 2014 INFO RESET A1 READ DOSES DATA Doses counter A B esc...
Страница 19: ...Pag 19 27 03 2014 A2 READ DOSES DATA Reset doses counter A B...
Страница 20: ...Pag 20 27 03 2014 B INFO RESET SYSTEM DATA...
Страница 23: ...Pag 23 27 03 2014 Press Enter key to go to the next programming doses level SEE FOLLOWING TABLE...
Страница 29: ...Pag 29 27 03 2014...
Страница 33: ...Pag 33 27 03 2014...
Страница 36: ...lb 05061 02 EN Pag 36 27 03 2014...
Страница 39: ...Pag 39 27 03 2014 DISPLAY REGULATION...
Страница 42: ...Pag 42 27 03 2014...
Страница 43: ...Pag 43 27 03 2014...
Страница 44: ...Pag 44 27 03 2014...
Страница 46: ...Pag 46 27 03 2014...
Страница 50: ...lb 05061 02 EN Pag 50 27 03 2014 1 1 3 3 5 5 7 7 2 2 4 6 4 6 esc esc V esc...
Страница 59: ...Pag 59 27 03 2014...