background image

1. INTRODUCTION

This operation instruction manual conforms to the requirements of the 2006/42/EEC Machine Directives and subsequent
amendments. In the light of this , special attention has been given to safety aspects and accident prevention in the work-
place for each stage in the machine's "life" . Information which could be of particular assistance to the operator has been
highlighted .

The "Operating instructions" are an integral part of the machine and should be consulted before , during and
after the start up of the machine and whenever else required . The content of these instructions should always
be carefully observed .

The observance of the above is the only way to achieve the two fundamental aims of this manual :

Optimization of machine performance
Prevent damage to the machine and injury to the operator

The index of the chapters and the index of the drawings , diagrams and tables is contained in chapter 3 and can be
used to help the location of specific information .

CAUTION : BEFORE INSTALLING THE MACHINE , READTHE OPERATING INSTRUCTIONS CAREFULLY

2. INFORMATION ABOUT MAINTENANCE ASSISTANCE

2.1 GUARANTEE

MACC S.r.l. products are guaranteed against material and manufacturing defects for a period of 12 months from the
date of delivery or , if the machine is installed by MACC employees , from the date of machine start up .
The buyer is only entitled to the replacement of parts which are acknowledged as faulty : carriage and packing are at
the buyer's expense . In the event of the above , the following information should be supplied :

1. Date and number of purchasing document .
2. Machine model .
3. Serial number .
4. Code of any relevant drawings .

Requests for compensation for the inactivity of the machine will not be accepted .
The guarantee does not cover uses which are not in line with these operating instructions which are an integral part
of the machine . Nor is maintenance covered if the instructions supplied are not observed .
The guarantee will not cover machines which have undergone unauthorized modifications .
Modification or tampering with the safety devices is strictly forbidden .

3. INDEX

3.1 INDEX OF CHAPTERS

Chap.

1

Introduction

Chap.

2

Information about maintenance assistance

Chap.

3

Index of chapters , drawings , diagrams and tables

Chap.

4

Description of the machine
Safety standards complied with during the design and construction of the machine
Description of the machine and its components

Chap.

5

Main technical data

Chap.

6

Handling and transportation

Chap.

7

Installation

Chap.

8

Start up and operation
Devices and their location
Tools supplied
Operation
Special safety checks
General safety rules
Measures to prevent residual risks
Safety guidance notice labels on the machine

Chap.

9

Maintenance and repairs
General safety measures
Routine checks and maintenance
Description of routine maintenance

Chap.

10

Information regarding environmental noise

Chap.

11

Laying off and dismantling

Chap.

12

List of spare parts

1

Содержание SPECIAL 411 CSO

Страница 1: ...INSTRUCTION MANUAL FOR OPERATION BETRIEBSANLEITUNG MANUEL D INSTRUCTIONS POUR L EMPLOI MANUAL DE INSTRUCCIONES DE USO COSTRUTTORE MANUFACTURER ERBAUER MACC s r l SCHIO VI ITALY CONSTRUCTEUR CONSTRUCT...

Страница 2: ......

Страница 3: ...IRECTIVE 2014 30 UE DIRECTIVE ON ELECTROMAGNETIC COMPATIBILITY 2014 35 UE LOW VOLTAGE DIRECTIVE DEN NORMEN BEZ GLICH DER MASCHINEN RICHTLINIE 2006 42 EWG 2014 30 EWG RICHTLINIE ZUR ELEKTROMAGNETISCHEN...

Страница 4: ......

Страница 5: ...HINE WITHOUT CUTTING FLUID ES IST STRENG VERBOTEN DIE MASCHINE OHNE SCHNEIDFL SSIGKEIT IN BETRIEB ZU NEHMEN IL EST SEVEREMENT INTERDIT D UTILISER LA MACHINE SANS LIQUIDE DE COUPE SE PROH BE TERMINANTE...

Страница 6: ......

Страница 7: ...ATEMWEGE ZU TRAGEN BITTE DAS GER T NUR IN GUT BEL FTETEN R UMEN ANWENDEN SYST ME DE MICRO LUBRIFICATION SI LE SYST ME EST INSTALL SUR LA MACHINE IL EST IMP RATIF DE PORTER UN MASQUE DE PROTECTION POUR...

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ...lacement of parts which are acknowledged as faulty carriage and packing are at the buyer s expense In the event of the above the following information should be supplied 1 Date and number of purchasin...

Страница 12: ...ances and preparations pentabromodiphenyl ether octabromodiphenyl ether Directive 2002 44 EC of the European Parliament and of the Council of 25 June 2002 on the minimum health and safety requirements...

Страница 13: ...e carried out by trained staff 7 MACHINE INSTALLATION A MACHINE CHECK The machine should be checked to make sure that it has not been damaged during transportation and handling If the machine appears...

Страница 14: ...t during the cutting operation then secure it again CUTTING OPERATION A Before cutting check that the inclination is the one required In order to correct or change the inclination place the bench leve...

Страница 15: ...nstable operating positions Find a safe and evenly balanced position to operate the machine C Keep the work area tidy untidiness increases the risk of accidents D Do not use the power supply cable to...

Страница 16: ...parts of piece locking vice Remove jaw 27 DRAW 10 ENCL 4 withdraw vice 16 completely by lowering the lever 22 Clean and grease the mobile parts of the counter vice and vice 16 17 In case of sliding di...

Страница 17: ...pacer 016 36 1 8 Vice gib 008 38 1 9 Idle pulley 015 36 1 10 Blade tightener pin 014 36 1 11 Blade tightener guide plate 046 32 1 12 Bench 025 42 1 13 Rotating plate 026 42 1 14 Coolant pump 090 90 1...

Страница 18: ...35 1 75 Fixed blade guide rod 028 A 32 1 76 77 Rotating pin 011 42 1 78 Bearing 32008 XA 015 38 2 79 Rotation pin nut 027 38 1 80 Brush 022 42 1 81 Brush support 024 42 1 82 Brush stop bush 023 42 1 8...

Страница 19: ...Transformer 30 VA 045 90 1 206 207 208 Fuse 10x38 AM 10A 206 90 3 209 Fuse carrier WEBER PCH3x38 092 90 1 210 Omega holed bar cm 10 046 90 1 211 Omega holed bar cm 17 047 90 1 212 Terminal CABUR CBD 2...

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ...IN TENSION BLATT TENSION LAMPE H3 SPIA START CICLO SPY CYCLE START ZYKLUS START LAMPE K TELERUTTORE TERMORESISTENZA THERMO RESISTANCE CONTROL SWITCH KONTAKTGEBER WIDERSTANDSTHERMOMETER KM0 TELERUTTORE...

Страница 33: ...R RELE RX RELE COMANDO TERMOSTATO THERMOSTAT COMMAND RELAY THERMOSTATSTEUER RELAIS RYV5 RELE DISCESA LAMA BADE DESCENT RELAY SAEGEBLATT ABSTIG RELE S SELETTORE FUNZIONE FUNCTION SELECTOR FUNKTION W HL...

Страница 34: ...CROSWITCH MANUAL START ENDCSHALTER MANUELL START T TEMPORIZZATORE TIMER ZEITGEBER TC1 TRASFORMATORE TRANSFORMER TRANSFORMATOR TR TERMOSTATO THERMOSTAT THERMOSTAT TR TERMORESISTENZA THERMO RESISTANCE T...

Страница 35: ...ALVE SCHNELL ELEKTROVENTIL ABSTIEG YV6 ELETTROVALVOLA APERTURA MORSA FISSA FIXED VICE OPENING SOLENOID VALVE ELEKTROVENTIL FESTER SPANNSTOCK FFNUNG YV60 ELETTROVALVOLA CHIUSURA MORSA FISSA FIXED VICE...

Страница 36: ......

Страница 37: ...CONTROLLATO IL 07 05 2018 DA REV 0 SPECIAL 411 CSO...

Отзывы: