20 Service Manual MACES7C-300-90-00
Note:
Make sure the water full detect pins are be inside water bin
5.8 SWITCH ON THE MACHINE
Make sure all of above procedures are correct, and then switch on machine by pressing power on switch. It
will take a few minutes for system start and boiler heating up.
5.9 FILL THE BOILER
The machine will start to fill boiler automatically when the system start working.
Remark: If the boiler refill error, switch off the machine then switch on the machine after 3 seconds, the
system will refill the boiler again.
Note:
When the machine is restarted, the heating element will heat the water until the programmed temperature
is reached. There is a temperature detection device to control this procedure.
The boiler is secured by two safety temperature regulators (STR) and temperature sensor, which will turn
off the heater if the temperature gets too high.
5.10 MACHINE SETTING UP
There are 5 items those need to be setup.
1. Set the grinder
2. Calibrate the container
3. Set the drink recipe
4. Set GUI language
5. Set machine vending mode