OM-210 089 Page 10
2-2.
Duty Cycle And Overheating
Duty Cycle is percentage of 10
minutes that unit can weld at rated
load without overheating.
If unit overheats, thermostat(s)
opens, output stops, and cooling
fan runs. Wait fifteen minutes for
unit to cool. Reduce amperage or
duty cycle before welding.
Y
Exceeding duty cycle can
damage unit or gun and void
warranty.
Overheating
0
15
A or V
OR
Reduce Duty Cycle
Minutes
duty1 4/95 − SA-802 090 / SA-802 091
A. 120 VAC Model
B. 230 VAC Model
3 Minutes Welding
7 Minutes Resting
30%dutycycle at 90 amps
3 Minutes Welding
7 Minutes Resting
30%dutycycle at 130 amps, 60 Hz −
20% duty cycle at 130 amps, 50 Hz
Содержание MW135
Страница 2: ......
Страница 4: ......
Страница 29: ...OM 210 089 Page 25 SECTION 6 ELECTRICAL DIAGRAM ST 205 400 53 Figure 6 1 Circuit Diagram For 120 VAC Model...
Страница 30: ...OM 210 089 Page 26 ST 210 011 B 53 17 Overload Feed Motor Figure 6 2 Circuit Diagram For 120 VAC CSA Model...
Страница 31: ...OM 210 089 Page 27 ST 205 423 B 53 53 Figure 6 3 Circuit Diagram For 230 VAC Model...
Страница 41: ...OM 210 089 Page 37 Notes...
Страница 46: ......