![M2 Antenna Systems SYSTEM SAMPLE 3 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/m2-antenna-systems/system-sample-3/system-sample-3_assembly-manual_3202814013.webp)
MAINTENANCE & SPARE PARTS LIST
90 day maintenance
1. Visual inspection of complete system, look for rust or corrosion and loose hardware.
2. Manually move each axis individually and LISTEN for smooth operation.
3. Check cables for wear and cracking.
4. Check each axis for physical looseness and or backlash (adjust if necessary).
5. Remove covers, check and clean any excessive foreign debris.
6. Grease main gear and worm gear.
7. Lubricate polarity chain with chain lubricant.
8. Check for proper operation of each axis.
9. Replace covers.
1 year maintenance
1. Visual inspection of complete system, look for rust or corrosion and loose hardware.
2. Manually move each axis individually and LISTEN for smooth operation.
3. Check cables for wear and cracking.
4. Check each axis for physical looseness and or backlash (adjust if necessary).
5. Remove covers, check and clean any excessive foreign debris.
6. Check AZ-1000 and EL-1000, thrust block oil-light bearings for wear.
7. Check main load bearings for each individual axis and look for radial slop and or bearing binding.
8. Grease main gear and worm gear.
9. Check physical limit switch operation.
10. Check for proper operation of each axis.
11. Replace covers.
SYSTEM SPARE PARTS LIST
AZ/EL motor gear box / thrust block assembly. ........................................... 1
Bearing 3”, drive side / coast side................................................................ 2
Reed switch (AZ/EL).................................................................................... 4
Limit switch (AZ/EL)..................................................................................... 2
RC2800PRKX2SU....................................................................................... 1