CABLE ROUTE FLAG & BRIDGE
AZ Cable Route
The Azimuth axis control cable simply attaches to the AZ axis then loops down and back to the full cable bundle
coming from the bottom of the cable pass through 6 to 12 inches below the exit of the pass through. Taping or
the use of nylon tie to keep the lower main cable bundle together below the cable pass through is recommend-
ed.