MAINTENANCE

For effective use and longer life of the unit, regular checking appropriate at once a year is recommended.  In the case regular 
checking is not performed, the unit may result in failure for shorter life-span depending on its operating conditions. 

 

CHECKING POINT

• Check the main power voltage. (voltmeter)
• Measure the open-shut operation time. (stopwatch)
• No abnormal noise during open-shut operation. (auditory)
• No rust, no corrosion inside the machinery. (visual)
• Non condensing inside the machinery. (visual)
• No discolored parts inside the machinery where can be visually checked. (visual)
• No significant vibration variation from the time of installation during operation. (tactile)
• No deterioration and changes of the packing and O-ring between the mechanism and the cover, and on the inner surface of 

the lid of the BOX. (visual)

 

NO NECESSARY CHECKING POINT

There is no need of lubrication for the transmission gear mechanism inside the machinery. 
The mechanism is lubricated with organic molybdenum grease.  There is no oil separation from thickener due to high or low 
temperature, or frequent operation. (While using, the oil color changes to kind of black. It is no problem for quality.)

 

REGULAR TEST RUNNING

If the valve is not frequently operated, run a test operation regularly (once a week, for example) to check proper functions.

FAILURE AND PROVISION

 

NO OPERATION

First, perform the checking point.

• Replacing the fuse:   Exchanging the parts
• Rust and corrosion inside the machinery:   Exchanging the unit
• Failure on power circuit and control PWB:   Exchanging the unit
• Degradation of various parts due to end of life-span:   Exchanging the unit

Содержание EAR70

Страница 1: ...hock or electric leakage due to dew condensation A fuse is installed on the top side of the control PWB in side the unit for safety It is 250 V 2 A slow blow type A spare fuse is secured on the base p...

Страница 2: ...necting surface is high temperature or its radiated heat is high If the temperature of the unit rises by a heat con ducted or radiated from external it may cause a failure ENVIRONMENT The unit does n...

Страница 3: ...12 sq Manual Operation Stem 8 sq Control PWB Terminal BOX Cover Screw Earth Symbol Earth Screw 2 G3 4 Conduit Port 2 G1 2 Conduit Port Motor Capacitor Plate Specifications POWER VOLTAGE INPUT OUTPUT F...

Страница 4: ...operation stem cannot be operated Shape of the manual operation stem is 8 mm square Use an adequate wrench Moving the output stem to the direction of full open turn the manual operation stem to the r...

Страница 5: ...atically judges the abnormally low input if the input signal is suddenly fallen to the lower of the set value from 20 mA position or middle position SELECTABLE BY ORDERING INFROMATION POSITION OF SW1...

Страница 6: ...T STEM Viewing from indicator OUTPUT SW 4 mA DC Open 90 Turn Counter Clockwise OPEN O 4 mA DC 1 2 3 4 ON 20 mA DC Shut 0 Trun Clockwise SHUT S 20 mA DC VOLTAGE INPUT CCW INPUT POSITION OF OUTPUT STEM...

Страница 7: ...of full open position Operation direction of output stem differs according to the rotation direction of each adjuster as following 20mA DC input full open 90 SPAN approx 5 approx 4 SPAN ZERO ZERO max...

Страница 8: ...stallation during operation tactile No deterioration and changes of the packing and O ring between the mechanism and the cover and on the inner surface of the lid of the BOX visual NO NECESSARY CHECKI...

Отзывы: