182
Installation Procedure, LXE Models 6723 Bridge & 6730 AP (RoHS)
NEMA Type 4 Enclosure Reference Guide
E-EQ-NEMARG-F
159089-0001-R Rev. A
Page 8 of 15
20. Remove the adhesive backing and apply three (3) of the Foam Pads to
Bracket, 160042-0001-R, as shown in figure 12.
21. Plug the output power cord from the Power Brick into the Power Injector and
route cable as shown in figure 13.
22. Position the AC Power Brick over the Foam Pads with the label side (bottom)
up and the AC input pointing towards the bottom of the box. See figure 14.
Figure 12
Foam Pads
Figure 13
Содержание Nema 4
Страница 4: ......
Страница 8: ...iv Table of Contents NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...
Страница 20: ...12 Accessories NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...
Страница 42: ...34 Installation Procedure LXE Model 6520 AP non RoHS NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...
Страница 106: ...98 Installation Procedure LXE Models 6723 Bridge 6730 AP non RoHS NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...
Страница 118: ...110 Installation Procedure LXE Models 6723 Bridge 6720 AP non RoHS NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...
Страница 134: ...126 Installation Procedure LXE Model 6520 AP RoHS NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...
Страница 198: ...190 Installation Procedure LXE Models 6723 Bridge 6730 AP RoHS NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...
Страница 210: ...202 Installation Procedure LXE Models 6723 Bridge 6720 AP RoHS NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...
Страница 216: ...208 Installation Procedure Lightning Suppression Accessories RoHS NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...
Страница 220: ...212 Index NEMA Type 4 Enclosure Reference Guide E EQ NEMARG F ...