ISSUE DATE: FEBRUARY 2018
ORIGINATOR: SKILTEC
REPLACES ISSUE DATE: NOVEMBER 2015
APPROVED BY: S. GONZALEZ
PAGE 26 OF 38
PRODUCT INFORMATION MANUAL
SECTION: 12 LUMINETTE PRIVACY SHEERS
Connect the DC Power Supply
NOTE:
When power is connected to the motor, a green LED inside
the manual control button housing will flash to indicate the sheer is
ready.
■
Plug the power cable from the motor into the extension cable.
■
Plug the other end of the extension cable into the DC power
supply.
■
Secure the extension cable using the C-clips provided. Hide the
cable behind the fabric, making sure it does not impede operation.
■
Space the C-clips approximately 385mm apart along the
extension cable, as shown.
■
Plug the DC power supply into the power source.
WARNING:
Keep cables and small parts
out of the reach of children. They can wrap cables around
their necks and
STRANGLE
. They can also put small parts
in their mouths and
CHOKE
.
WARNING:
Electric shock and/or a fire hazard may occur
if not properly installed.
385mm
Maximum
DC
Power
Supply
Wire Retainer
Extension Cable
Power Cable
Motor
Assembly
Test Headrail Operation
■
Use the manual control button on the motor to test the operation of
the headrail, following the sequence below.
1. Press and release the button to traverse the carriers across the
full length of the headrail.
2. Press and release the button to fully rotate the pinion clips in one
direction.
3. Press and release the button to fully rotate the pinion clips in the
opposite direction.
4. Press and release the button to rotate the pinion clips to the
neutral (vanes open) position.
5. Press and release the button to traverse the carriers to the fully stacked position.
■
Pressing the manual control button while the carriers are traversing or the pinion clips are
rotating will stop the action. The next button press will traverse the carriers or rotate the
pinion clips in the opposite direction.
Manual
Control
Button