L O A D I N G T H E C A R R I E R S
The drapery carriers are installed at the factory, however, the required number of carriers must be verified. Draperies require
one carrier per hook. The first two drapery hooks should hook on the master carrier for left, right and split draw systems (see
respective diagrams on the next two pages). The number of carriers required is equal to the number of drapery hooks in
fabric minus four (4).
L E F T A N D R I G H T S I N G L E D R A W S Y S T E M S
Idle End
T O A D D O R R E M O V E C A R R I E R S :
Single Draw: Left or Right
Pry out square plug on the motor side of the track.
Insert or remove auxiliary carriers through the
square hole in the track until the proper number of
carriers are installed.
Replace plastic square plug by pushing it up into
the square home until it snaps into place.
3
2
1
Motor
Housing
hooks for
last two (2)
drapery
hooks
Master Carrier
6
Carrier Installation – Left and Right Draw Systems
4
First two (2)
drapery hooks
should hook here
3
Pry out here using
flat blade screw driver
1
Auxiliary Carriers
Motor End
The number of carriers required is
four less than the total number of
hooks on the drapery. The first two
drapery hooks should hook to the
master carrier and the last two
drapery hooks should hook to the
motor housing.
Sivoia
®
Drapery