
Luminate Wireless Access Point Installation Guide
4
Installing the Access Point
The following sections detail the steps needed to install the Luminate Wireless Access Point. This chapter covers:
“Installing the Access Point” on page 13
“Using the Ceiling Tile Rail Adapter” on page 13
“Confirming Power Connection” on page 15
“Configuring the Access Point” on page 15
Installing the Access Point
Before you mount the AP, perform the following step(s) to ensure successful installation. For each AP you’re installing:
1. Manually note and record the serial number of each AP you are installing onto a hard copy floor plan.
2. Enter the AP serial number in the installer tool.
Using the Ceiling Tile Rail Adapter
The Luminate Wireless AP ships with two ceiling rail adapters for 9/16” and 15/16” ceiling tile rails. Additional wall
mount adapters and ceiling rail adapters for other rail styles are available as accessory kits. To install the AP using a rail
adapter, do the following:
1. Pull the necessary cables through a prepared hole in the ceiling tile near where the AP will be placed.
2. Place the adapter against the back of the AP with the adapter at an angle of approximately 30 degrees to the tabs (see
Figure 4).
When the AP is powered on, it contacts the cloud Public Provisioning Server and gets its initial image package
and configuration.
The template for this is located in the back of this installation guide, in Appendix A.
Содержание LEAP-10
Страница 1: ...Access Point Hardware Installation Guide...