background image

Display units

R-phase

S-phase

T-phase

Test/Reset
Func 

Display
Sel

Current  

Time 

Load ratio

3-phase current/Trouble cause

2

ᆞ Check the communication cable to insert smoothly. 
ᆞ Combine the display units with the main units in tight,

Or its Relay contact is opened.

ᆞ Please check the relay by pressing the TEST/RESET Key before 

running the Motor, 

ᆞ Insert the finger proof  necessarily in the terminal block,after

wiring in case of screw type products. 

ᆞ Refer to wiring diagram for proper terminal 

connection.

ᆞ After wiring, Cover the Finger Proof necessarily.
ᆞ Use the product in a range of the rated voltage and current 

shown on the name plate.

It may cause a malfunction.

ᆞ When the device useless, it should be dispose of them as 

an Industrial waste.

!

CAUTION

Содержание DMP Series

Страница 1: ...ead the instruction manual and safety precautions before use products This manual should be given to the person who actually uses the products and is responsible for their maintenance WARNING Offending against the message will result in death or serious injury CAUTION Incorrect handling of the device may result in minor injury or physical damage ...

Страница 2: ...ing or service to prevent electric shocks and burn due to short circuit ᆞ Do not touch any live naked terminals It make an electric shock ᆞ Install the noise filter in the external if the harmonic is more than 30 It may cause a malfunction ᆞ Compare the product with that order us The Product which is different from order is may cause a malfunction or a fire ᆞ Check the parts to miss or crack by tr...

Страница 3: ... the relay by pressing the TEST RESET Key before running the Motor ᆞ Insert the finger proof necessarily in the terminal block after wiring in case of screw type products ᆞ Refer to wiring diagram for proper terminal connection ᆞ After wiring Cover the Finger Proof necessarily ᆞ Use the product in a range of the rated voltage and current shown on the name plate It may cause a malfunction ᆞ When th...

Страница 4: ...ent set ratio Within 3S Within 0 1S Over 70 of the rate of unbalance Within 3S Over 50 of the rate of unbalance Within 5S 180 than seting current within 5S More than the lock set current ratio Within 0 5S More than the instantaneous set current ratio Within 0 1S More than the set ground current within the set time Load Ratio 60 110 DMP 06 S E Z 220 Current 06 60 0 5 6 0A 5 0 60A Wiring S Screw T T...

Страница 5: ... the catalog and home page www lsis biz for further details Head Office Yonsei Jaedan Severance Bldg 84 11 5ga Namdaemun_ro Jung gu Seoul 120 749 Korea TEL 82 2 2034 4870 FAX 82 2 2034 4713 4 MEMO 7956 2121 001 ...

Отзывы: