4 - 21
⑤
Handling of the 3-point linkage
1. Lift rod (RH)
2. Stabilizer
3. Lower link
4. Lift rod (LH)
5. Upper link
6. Lift rod pin
7. Upper link pin
①
②
③
④
⑥
⑤
⑦
Down speed control knob
Fast
Slow & Lock
When driving the tractor without attaching implement, comply with the followings.
1. Connect the handle of the upper link(5) to the fixing hook installed in front of the upper link.
2. Connect stabilizer(2) to the lower link(3) to avoid the lateral movement of the lower link.
If the 3-point linkage is not necessary, remove it as follow.
1. Pull out upper link pin(7) and remove the upper link(5).
2. Detach the rear side of the stabilizer(2) from the lower link(3).
3. Detach the lower side of lift-rod(LH)/(RH) while holding the lower link(3) tightly not to fall down.
4. Remove lift rod (LH), lift rod (RH) and stabilizer(2) step by step.
5. Remove lower link(3) carefully not to get hurt due to its own weight.
When using hitch/drawbar, or driving on the road,
lift up the 3-point linkage and fix it by turning the
down speed control knob to the locking position.
▶
The parts of 3-point linkage are
very heavy. When handling
them, take care not to get injury.
PLEASE BE CAREFULL !
Caution
Содержание MT458
Страница 1: ...LS TRACTOR MT458 MT463 MT468 OPERATOR S MANUAL Stage...
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 154: ...4 32 Attaching points for Front end loader When attaching the front end loader refer to the drawings as below Unit mm...
Страница 162: ...4 40...
Страница 165: ...5 3 Identification markings Metric hex bolt head 1 Manufacturer s identification 2 Property class GS 8 8 1 2...
Страница 235: ...7 1 Unit mm 7 Dimension and Specification When applying front tires 11 2 20 8PR rear tires 14 9 30 8PR Roll bar type...
Страница 236: ...7 2 Unit mm When applying front tires 11 2 20 8PR rear tires 14 9 30 8PR Cabin type...
Страница 241: ......
Страница 242: ......