TOP AND SIDE SCREWS
Secure the end cap to the panels using five gasket screws in line with
the previously placed screws. See Detail A.
Once the top screws are in place, drive four gasket screws starting
2-1/2˝from the end of the end cap and 1-1/2˝in from the top face of the
end cap. Space the screws 17˝apart. See Detail B below.
SCALE 1:75
SCALE 1:70
DETAIL A
SCALE 1:18
DETAIL B
SCALE 1:20
2-1/2˝
1-1/2˝
17˝
Line up new gasket
screws with existing
rows of screws
10
Содержание ReadyPeak
Страница 1: ...1 INSTALLATION MANUAL...
Страница 3: ...1...
Страница 5: ...3 STEP 1 Panel 1 SCALE 1 75 DETAIL A SCALE 1 20...
Страница 8: ...DETAIL A SCALE 1 25 6 Step 2 Field Panels SCALE 1 75...
Страница 10: ...SCALE 1 75 DETAIL A SCALE 1 14 8 Step 3 Left End Cap...
Страница 14: ...SIDE 2 OF SHED Repeat steps 1 6 on the other side of the shed frame SCALE 1 40 12 Step 5 Repeat...
Страница 15: ...13 Step 6 Ridge Cap DETAIL A SCALE 1 25 SCALE 1 75...