London Electronics INT-AH Скачать руководство пользователя страница 7

Page 4

Getting Started

First, please check that the display will suit all the requirements of your
application. Page 4 has some important warnings - please check that all warnings
are covered.

If you have alarm relay output options, you may need to configure the board
before installing the meter in a panel. See the separate sections in this manual for
that option.

Check that your panel cutout is correct , 92mm wide, 45mm high. You must fit the
meter in a protective enclosure for installation class II service. Remove the 2
screws holding the U clamp at the rear of the case. Slide the meter into the cutout
and re-fit the U clamp and  screws. Tighten the screws just enough to hold the
meter  firmly in place and make sure the sealing gasket is evenly held between
the panel and the bezel.

Connect the signal and power cables, to the appropriate screw terminal connectors.
Check that you are using the correct terminals or you may cause damage to the
meter. Do not connect any output or alarm cabling yet.

Apply power, and confirm that the meter illuminates all segments for a few
seconds.

The lockout switch should be OFF to allow you to change the meter’s settings.
Set the scaling to suit your system, using one of the scaling methods described in
this manual. Check that the meter responds correctly. Now, adjust your alarm
settings, if necessary. Use a continuity tester to check that the relay contacts
operate correctly. Switch the meter off, and check alarm relay contact status.
Check that  the contact status suits your system, in conditions of power loss to the
meter.

When you have verified all settings, you can connect the alarm relay cables,  to
check that your system operation is satisfactory.

Remember to set the lockout switch ON when you have finished , to prevent
accidental loss of your settings.

Содержание INT-AH

Страница 1: ...2003 IEC 1010 89 336 EEC Ampere Time Display Meter Plating Current monitor with pulsed outputs Model INT AH Rev AH 1 1 Software Version DIGIT Min ZERO SPAN dp ZERO SPAN d p MAX MIN TARE ALARMS OK RES...

Страница 2: ...Notes...

Страница 3: ...Calibration Tamper detection 8 Connections 5 Decimal point position selection 6 Declaration of Conformity 17 Failsafe alarm setting 10 General description 3 Getting Started 4 Installing options 9 Intr...

Страница 4: ...cover damage caused by misuse or accident IMPORTANT If the meter is a vital component in your process you may wish to buy a spare to cover possible failure or accident as we cannot guarantee instant...

Страница 5: ...heck that model number and supply voltage suit your application before you install the meter Don t touch any circuitry when the meter is powered because lethal voltages may be present on the circuit b...

Страница 6: ...n when fitted with appropriate plug in option boards Alarm outputs 2 and 4 give pulsed outputs of 100mS each time a batch total has been reached The front panel has a 6 digit 7 segment window for disp...

Страница 7: ...hesignalandpowercables totheappropriatescrewterminalconnectors Check that you are using the correct terminals or you may cause damage to the meter Do not connect any output or alarm cabling yet Apply...

Страница 8: ...unt should be located in the low voltage unswitched return line to minimise common mode noise These connectors are only used when options are fitted Connections E Common No function Disp Current Reset...

Страница 9: ...or ampere hour applications this is normally the rated current of your shunt If the value is correct press the OK button otherwise use the DIGIT key to select digits and the UP or DOWN arrow keys to a...

Страница 10: ...you want to count ampere HOURS b Set InHi 75 00 mV c Set rd Hi to 200 0 d Set InLO to 0 00 mV e Set lo Rd to 0 2 You have a 60mV shunt rated at 100 Amperes and want to display ampere hours to the nea...

Страница 11: ...ommand Front Panel key reset command 1 Link terminal 7 to terminal 10 2 Set lockout switch ON 3 Press Down Arrow key to reset display Remote contact closure resetting 1 Connect a normally open contact...

Страница 12: ...board We strongly suggest that you use anti static precautions toprevent damage to the semiconductors The board assemblies will look something like this Always be careful to connect the pins to socket...

Страница 13: ...ill see two small screws one on each surface Remove both screws Now clip off the front bezel and slide the meter assembly carefully out via the front of the case The relay board plugs into the main bo...

Страница 14: ...e until its LED is flashing then press the ALARM key for more than 3 seconds You will see one digit is brighter than the others You can change its value using the UP DOWN buttons and then select other...

Страница 15: ...sion Dual slope 10 conversions per second Resolution 1 in 63000 max over full range Display update rate 2 5 readings per second Memory of total E2PROM with 10 year storage No batteries required Plug I...

Страница 16: ...Page 13 Record of Revisions Changes 31July2003 Released...

Страница 17: ...Notes Page 14...

Страница 18: ...Page 15 48 0 96 0 92 0 22 0 102 0 12 0 DIGIT Min ZERO SPAN dp ZERO SPAN d p MAX MIN TARE ALARMS OK RESET OUTPUT AL1 AL2 AL3 AL4 0 O P 100 O P Lineariser Max...

Страница 19: ...Page 16 12 0 102 0 22 0 44 0 92 0 45 0...

Страница 20: ...ngshallberoutedseparatelytopowercarryingcabling includesrelayoutputwiring Allsignalcablingshallbescreened Thescreenshallonlybeterminatedtothepowerearthterminal This is to confirm that the Product cove...

Отзывы: