
Operation and use of the set
- 16 -
Connection of argon-arc welding
③
Turn on the power switch of welding power supply
Wait for about 2 to 3 minutes after turning on the power switch and
the no-load voltage has been generated, then you may start
welding operation.
④
Select the appropriate welding current as per needs of welding.
⑤
Weld
⑥
Turn off power switch of the welding power supply.
4) Stopping the engine
①
Turn off the AC circuit breaker
②
Turn off the engine switch
③
Turn off the fuel switch
If an emergency stop of the engine is needed, the engine switch shall be
up in the OFF position.
Welding cable-
Welding
cable+
Work piece
Gas meter
Air
tank
Torches
Содержание WG6500M-1
Страница 1: ......
Страница 4: ......
Страница 29: ...Schematic diagram 25 X Schematic diagram ...
Страница 31: ......