![Lombardini ECOWIND 350 C - EUR 12V Скачать руководство пользователя страница 127](http://html.mh-extra.com/html/lombardini/ecowind-350-c-eur-12v/ecowind-350-c-eur-12v_assembly-and-installation-manual_1938340127.webp)
53
THIS MANUAL IS PROPRIETY OF
ECOWIND by LOMBARDINI
- ALL FORMS OF REPRODUCTION, PARTIAL OR OTHERWISE, IS STRICTLY PROHIBITED
G
B
FG
Fig. 97
Fig. 96
R
3 -
ASSEMBLY AND INSTALLATION
Step Description
6
After fastening the pipes and cables under the cab floor, proceed with the tube bundle towards the condenser. (Attached
previously) fig. 96.
7
Continue attaching the pipes on the outside, boring through the rear of the cab using a 3.5 mm bit, and inserting the
steel/rubber clamps
FG
around the pipes. Fasten using the supplied self-threading screws fig 96.
Step Description
8
Pipe and wiring, at the finished installation on the floor and back cab fig. 97
Attention!
Make sure that the curvature of the pipes R during passage from the vehicle frame to the back of the cab has been
checked and is adequate.
Non-observance of this point could lead to the pipes being crushed, thereby compromising the performance of the system.