![Lombardini ECOWIND 350 C - EUR 12V Скачать руководство пользователя страница 126](http://html.mh-extra.com/html/lombardini/ecowind-350-c-eur-12v/ecowind-350-c-eur-12v_assembly-and-installation-manual_1938340126.webp)
52
THIS MANUAL IS PROPRIETY OF
ECOWIND by LOMBARDINI
- ALL FORMS OF REPRODUCTION, PARTIAL OR OTHERWISE, IS STRICTLY PROHIBITED
G
B
Fig. 93
Fig. 92
Fig. 94
Fig. 95
F
ASSEMBLY AND INSTALLATION
- 3
Step Description
2
After fastening the Power Unit, overturn the vehicle
cabin and fasten the gas pipes and the electrical
cables (regardless of the position in which the con-
densing unit has been installed) to the vehicle frame
using steel, rubber and plastic clamps and a range
of nuts and bolts supplied with the system, as far as
the rotation fulcrum point
F
of the cabin, fig 92-93-94.
Step Description
5
When the cab rotation fulcrum point
F
has been rea-
ched (fig. 95), fix the tube bundle to the the cab and
down floor cab (fig. 95), boring holes (Ø 3,5 mm) and
using steel/rubber clamps along with self-threading
screws supplied with the system.
Step Description
3
WARNING
While positioning, remember to protect the ends
of the GAS G6 / G8 / G10 pipes with adhesive tape,
in order to prevent entry of impurities or residues
dangerous to the passage of the coolant.
4
When possible, use the existing original tube bundles
(fig. 95), in order to use only the plastic clamps
supplied, to prevent perforation.
When this method is used, it is necessary to determine
the best passage taking the pipes and electrical cables
to the peripherals.
down floor cab