50
THIS MANUAL IS PROPRIETY OF
ECOWIND by LOMBARDINI
- ALL FORMS OF REPRODUCTION, PARTIAL OR OTHERWISE, IS STRICTLY PROHIBITED
G
B
Fig. 93
Fig. 92
Fig. 94
Fig. 95
down floor cab
F
ASSEMBLY AND INSTALLATION
- 3
Step Description
2
After fastening the Power Unit, overturn the vehicle
cabin and fasten the gas pipes and the electrical
cables (regardless of the position in which the con-
densing unit has been installed) to the vehicle frame
using steel, rubber and plastic clamps and a range
of nuts and bolts supplied with the system, as far as
the rotation fulcrum point
F
of the cabin, fig 92-93-94.
Step Description
5
When the cab rotation fulcrum point
F
has been rea-
ched (fig. 95), fix the tube bundle to the the cab and
down floor cab (fig. 95), boring holes (Ø 3,5 mm) and
using steel/rubber clamps along with self-threading
screws supplied with the system.
Step Description
3
WARNING
While positioning, remember to protect the ends
of the GAS G6 / G8 / G10 pipes with adhesive tape,
in order to prevent entry of impurities or residues
dangerous to the passage of the coolant.
4
When possible, use the existing original tube bundles
(fig. 95), in order to use only the plastic clamps sup-
plied, to prevent perforation.
When this method is used, it is necessary to determine
the best passage taking the pipes and electrical cables
to the peripherals.
Содержание ECOWIND 350 C AUS
Страница 2: ......