INSTALLATION OF THE SPLIT-UNIT
3 -
ASSEMBLY AND INSTALLATION
Bore Ø 50 “R”
Bore Ø 34 “Q”
Bore Ø 34 “S”
n° 9 holes Ø 6 mm
RECOMMENDATION FOR BORING PROCEDURE
3 rubber cable
guides G
WARNING!
Pay special attention and take particular care
during the drilling phases, to prevent the cab
internal upholstery from being damaged!!
Step Description
7
After the drilling operations are completed, insert the 3 supplied
G
rubber cable guides into the holes to 34 mm and made
in the exterior metal of the cab (fig. 84).
Step Description
6
Using a hollow mill, bore through the pressed cardboard wall inside the cab and the sheet metal of the rear of the cab,
in the same position as the existing openings on the counter frame for the passage of the following connections:
fig. 82 (
Q
): gas pipes (make opening only in inner wall) Ø 34 mm;
(
R
): electrical system Ø 50 mm;
(
S
): condensation drainage pipe Ø 34 mm.
Step Description
2
Position the counter frame
O
fig. 78 supporting the split unit inside the cab. Use the split unit as a template taking care
to place it against a flat wall and to keep it ABSOLUTELY HORIZONTAL.
WARNING
The counter frame unit (O) must be correctly positioned in conformance with the above instructions, to prevent
condensed water from leaking out.
3
Then mark 9 boring points referring to the holes
P
on the counter frame and keeping to the measurements shown in
the diagram in fig. 81 ( * ).
4
Using a Ø 6mm bit, bore 9 holes in the marked places.
5
Firmly secure and attach the counter frame
O
using the supplied “
Graf
J
” rivets
fig. 80
.
N.B. : Before attaching the split unit to the cab, make
holes to pass pipes and cables !!!
N.B.: The rubber to wiring
R
are already assembled on the external cable
EC
Ø 50 ONLY
FOR “R” WIRING
CABLE
D = 34 mm