Installation Guide
Installation
Installation steps
1. Connecting the power cable
2. Install the HDDs
3. Connecting external batteries
4. Connecting to the network
5. Power on
6. Checking LED information
Connecting the power cable
The 230V AC 50Hz main power can be connected to the marked connector
with copper wires with thickness of 1.5 mm
2
G
Ground
N
Null
L
Line
1. Connect the power cable with the right polarity to the power
connector block.
2. Tighten the screws of the power connector block with a Phillips
screwdriver! The fuse of the main power is 250 V 3,15 A normal.
10/17