background image

West 

approach

detector

GND

OUT

Center 

block

detector

GND

OUT

East 

approach

detector

GND

OUT

GND

2
1

OUT

 

 

Figure 12 – External detector wiring (NCE BD20 shown) 

 
 
 

Grade crossing bell  

The 

Grade Crossing Pro/2

 can control a grade crossing bell sound module in two ways. The preferred way, and less 

expensive option, is to plug in one of the bell modules we offer (#BELL-CL, #BELL-MD, #BELL-FA, #BELL-GS). If you 
use one of these modules the 

Grade Crossing Pro/2

 will fade the sound off when shutting off the bell. There are two sockets 

on the board to accept the module as shown in Figure 13a below. Carefully install the bell module by lining up the pins on 
the bottom of the module to the mating sockets on the 

Grade Crossing Pro/2

 board. Note that when the module is properly 

installed the bell module label will have the printing oriented in the same direction as the 

Grade Crossing Pro/2’s

 main chip. 

Also, there will be two open socket locations along the top end of the lefthand socket. A properly installed bell module is 
shown in Figure 13b below. The bell module requires an 8Ω speaker connected to the SPKR outputs as shown in Figure 13b. 
You can adjust the volume of the bell sound using the potentiometer labeled VOLUME next to the SPKR terminals. 

 

 

 

Figure 13a - Location for bell module                                                       

8Ω 

 

 

Figure 13b – Bell module installed

 

 

Figure 14 shows the wiring for an external grade crossing bell sound module. Shown is the ITT sound module version from 
2018 through the date on this document; contact us if you have a different version! You will need a 6 conductor ribbon cable 
(available from us, part number X-CABLE) to make the connections. The black connector end plugs onto the 6 pin header 
labeled “EXPAND” on the 

Grade Crossing Pro/2

 board. Make sure that the red stripe on the cable is closest to the edge of 

the board; there is a white stripe printed on the board to the left of the 6 pin header as a hint! Pin 1 (red stripe) of the cable 
prDC power to the bell module while pin 6 of the cable provides the “ground” connection to the bell module when it 
is turned on by the 

Grade Crossing Pro/2

. Note that you must install a small wire jumper between the two terminals on the 

bell module labeled SW. Finally, connect any 8 ohm speaker to the bell module. The ITT sound modules have their own 
volume control; the volume control on the 

Grade Crossing Pro/2 

does NOT affect an external bell module! 

 

Содержание GCP/2

Страница 1: ...IR4 if you want to change types The board is also offered without sensors version GCP 2 X for use with other brands of external detectors The infrared detection method has been improved and no longer...

Страница 2: ...2 is in sensor setup mode TRUE LAMP2 Signals don t fade on off like modern signals Signals fade on and off like older signals SEN TYPE Sensors are photocells or external current detectors Sensors are...

Страница 3: ...required IF the voltage provided to the Grade Crossing Pro 2 is greater than the rating on the bulbs most bulbs are rated at 12V AC or DC but you should check the instructions that come with the sign...

Страница 4: ...iring Tomar example NOTE You must check the instructions for your gate motor to determine the maximum voltage that the motor can accept For example Tomar uses Circuitron s Tortoise which has a maximum...

Страница 5: ...them this will allow the Grade Crossing Pro 2 to still properly detect a train that has stopped over any photocell with the gap between cars over a photocell EN EF WN WF Figure 6 Photocell wiring Pho...

Страница 6: ...the ties and roadbed Figure 8a Figure 8b Using across the rails infrared With this sensor mode and physical arrangement a train is detected when the infrared IR beam is broken by the train The IR comp...

Страница 7: ...f the four photocell sensitivity adjustment pots NOTE The four adjustment pots have NO affect when using either infrared sensor mode Do the following after you have connected power see page 9 to the b...

Страница 8: ...the SPKR outputs as shown in Figure 13b You can adjust the volume of the bell sound using the potentiometer labeled VOLUME next to the SPKR terminals Figure 13a Location for bell module 8 Figure 13b...

Страница 9: ...re flashing ON OFF OFF Rings continuously while signals are flashing ON OFF ON Stops ringing as the train clears but before flashing stops ON ON OFF Only rings while gates are lowering or raising ON O...

Страница 10: ...The problem with this implementation is that the Grade Crossing Pro 2 cannot differentiate between two trains traveling in opposite directions on different tracks As such it could easily get confused...

Страница 11: ...no train is present then you will probably see one or more of the red sensor LEDs lit up on the Grade Crossing Pro 2 board You may have the IR components sitting too high Make sure they are no higher...

Страница 12: ...e 2 If the product has been altered in any way e g soldering to the circuit board 3 If the current or voltage limitations of the product have been exceeded Requests for warranty service must include a...

Отзывы: