23
Fertilizer Spreader OM
Lubrication (Cont’d)
Grease Points (Cont’d)
8
7
Location:
Ground drive engaging lever (7, 8).
Interval:
Every 8 hours of operation.
9
10
Location:
Ground drive jack shaft bearings (9, 10).
Interval:
Every 8 hours of operation.
12
11
Location:
Slip clutch cylinder bearings (11, 12).
Interval:
Every 8 hours of operation.
13
14
15
16
17
Location:
Spinner bearings, top [PTO drive models
only] (13, 14).
Spinner bearings, bottom (15, 16).
Idler pulley bearing (17).
Interval:
Every 8 hours of operation.
Maintenance
Содержание FS 800
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 28: ...20 Fertilizer Spreader OM ...
Страница 38: ...30 Fertilizer Spreader OM ...
Страница 39: ...31 Fertilizer Spreader OM PARTS IDENTIFICATION AND HYDRAULIC SCHEMATICS Parts Identification ...
Страница 63: ...55 Fertilizer Spreader OM Appendix Torque Specifications Inches Hardware and Lock Nuts ...
Страница 64: ...56 Fertilizer Spreader OM Appendix Torque Specifications Cont d Metric Hardware and Lock Nuts ...
Страница 65: ......