32
12 Ton Spreader OM
Transporting (Towing with Truck)
CAUTION:
Tow only with a truck or vehicle
capable of pulling the weight of the spreader
and its contents.
Adjust the spreader hitch so the spreader is as level
as possible. Connect to the truck hitch and install an
approved hitch pin for the load, securing hitch pin with
a safety locking pin. Connect the safety chains to the
truck.
Connect the spreader’s running light wiring harness to
the truck. An adapter may be required.
IMPORTANT:
Make sure hydraulic hoses are secure
before transport.
IMPORTANT:
For models equipped with the steerable
hitch, ensure cylinder stops (1) are in
position on the cylinder rods and secured
before transport.
Set-up and Operation
Содержание FertiLogix F1210
Страница 2: ......
Страница 4: ......
Страница 10: ...2 12 Ton Spreader OM...
Страница 18: ...10 12 Ton Spreader OM Safety Instructions F1210 Fertilizer Spreader Identification...
Страница 19: ...11 12 Ton Spreader OM Safety Instructions L1230 Lime Spreader Identification...
Страница 22: ...14 12 Ton Spreader OM...
Страница 31: ...23 12 Ton Spreader OM Spreader Constants Rate Chart Hydraulic Variable Rate Ready Set up and Operation...
Страница 51: ...43 12 Ton Spreader OM Parts Identification PARTS IDENTIFICATION AND SCHEMATICS...
Страница 88: ...80 12 Ton Spreader OM Appendix Torque Specifications Inches Hardware and Lock Nuts...
Страница 89: ...81 12 Ton Spreader OM Appendix Torque Specifications Cont d Metric Hardware and Lock Nuts...
Страница 90: ......
Страница 91: ......