60
3 Operation
3.3.4
Initial priming with product
Preparation
• Switch dispensing station off and safeguard against unauthorised use.
• Disconnect compressed air supply.
• Observe safety regulations.
Positioning of Product Container A
• Raise Pump Unit A (D) to top position and hold.
• Lightly hand tighten the locking screw (G). Pump unit is locked into place in top
position.
• Insert product container into Receptacle (N) and position underneath Pump Unit A,
between the 3 centering pins.
• Unscrew vent screw (O) from follower plate (S).
• Hold Pump Unit A and back off locking screw (G).
• Lower the pump unit slowly until follower plate rests against the container rim.
• Gently press down with your hand to lower Pump Unit A until product flows from
bleed port (Z).
• Lightly hand tightens the locking screw. Pump unit is locked into place.
• Screw vent screw into the bleed port of the follower plate.
• Back off locking screw. Pump Unit A rests by its own weight on top of the product.
Crush hazard:
Risk of fingers getting crushed when pump unit is
lowered. Do not allow fingers to get between follower plate and
receptacle and/or product container.