4.2
Pinch Valve as Stationary Applicator Unit
4.2.1
Connecting to the Product Reservoir
• Screw the enclosed screw connection with the coated threads into the reservoir lid.
• Unscrew the sleeve nut from the reservoir connection.
• Slide the sleeve nut and the sealing cone in the correct position over the protection tubing.
• Slide a cone of the proper size and in the correct position over the product feedline
4
to the stop
into the protection tubing
3
. This ensures the sealing of the product reservoir.
Do not kink the product feedline when cutting
since this can damage it.
• Screw the sleeve nut into the reservoir connection.
☞
Allow the product feedline approx. 2 minutes to return to its original length.
• Cut off the product feedline
4
in the product reservoir at an angle according to the dimensions
given.
• Cut off the product feedline
4
on the Applicator Pencil directly at the plastic cone
13
.
• Stick on the dispensing needle
14
.
34
Installation
4
R
97107 / 97125
97108 / 97127
97107 / 97125
210 mm
97108 / 97127
285 mm
Содержание 97121
Страница 1: ...Bedienungsanleitung Operating Manual Quetschdosierventil Pinch Valve 97121 ...
Страница 2: ...2 16 14 15 97236 optional 3 4 11 17 18 19 20 21 13 10 12 13 4 3 1 2 4 5 6 7 8 9 ...
Страница 3: ......
Страница 23: ...23 Zubehör und Ersatzteile 8 14a 14b 14c 31 8 mm 30 0 mm 12 7 mm 7 56 1 mm 38 6 mm 23 10 22a 4 1 22b ...
Страница 25: ...25 ...
Страница 45: ...45 Accessories and Spare Parts 8 14a 14b 14c 31 8 mm 30 0 mm 12 7 mm 7 56 1 mm 38 6 mm 23 10 22a 4 1 22b ...