9
1
Determine boiler location
(continued)
13"
TOP
12"
(305 MM)
LEFT
14" (356 MM)
REAR
18" (457 MM)
FRONT
0"
RIGHT
1/4" (6 MM) MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1" (25 MM) MINIMUM CLEARANCE
AROUND VENT PIPE
OPEN
FRONT
DIR #2000582944 00
Figure 1-2
Alcove Installation - Minimum Required Clearances
AREA OF EACH OPENING
AIR OPENING
AIR OPENING
DIR #2000582942 00
Figure 1-1
Closet Installation - Minimum Required Clearances
⚠
WARNING
⚠
WARNING
Installation & Operation Manual
For alcove installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
an alcove structure due to elevated
temperatures. Failure to follow
this warning could result in fire,
personal injury, or death.
For closet installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
a closet structure due to elevated
temperatures. Failure to follow
this warning could result in fire,
personal injury, or death.