3
General venting
Figure 3-1
PVC/CPVC Two-Pipe Sidewall
Termination - See page 21 for more details
Figure 3-3
PVC/CPVC Concentric Sidewall
Termination - See page 24 for more details
Direct venting options - Sidewall Vent
Figure 3-2
Stainless Steel Two-Pipe Sidewall
Termination - See page 22 for more details
14
Installation & Operation Manual
Содержание KNIGHT 51
Страница 58: ...10 Start up Figure 10 2 Operating Instructions 58 Installation Operation Manual...
Страница 77: ...Installation Operation Manual Notes 77...
Страница 78: ...Installation Operation Manual Notes 78...
Страница 79: ...Installation Operation Manual Notes 79...