TOP
6" MINIMUM
LEFT
24" SERVICE
0" MINIMUM
FRONT
24" SERVICE
6" MINIMUM
BOTTOM
24" SERVICE
0" MINIMUM
1" MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1" MINIMUM CLEARANCE
AROUND VENT PIPE
OPEN FRONT
RIGHT
0" MINIMUM
Figure 1-2
Alcove Installation - Minimum Required Clearances
TOP
6" MINIMUM
LEFT
24" SERVICE
0" MINIMUM
BOTTOM
24" SERVICE
0" MINIMUM
1" MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1" MINIMUM CLEARANCE
AROUND VENT PIPE
CLOSED DOOR
FRONT
24" SERVICE
6" MINIMUM
6"
6"
VENTILATING
AIR OPENING
*
*
AREA OF EACH OPENING:
1 SQ. INCH PER 1000 BTU PER HOUR INPUT
WITH A MINIMUM OF 100 SQ. INCHES.
VENTILATING
AIR OPENING
*
RIGHT
0" MINIMUM
Figure 1-1
Closet Installation - Minimum Required Clearances
WARNING
For closet installations, CPVC or
stainless steel vent material MUST
BE used in a closet structure due to
elevated temperatures. Failure to
follow this warning could result in
fire, personal injury, or death.
Note:
Service clearances are recommendations only.
Note:
Service clearances are recommendations only.
WARNING
For alcove installations, CPVC or
stainless steel vent material MUST
BE used in an alcove structure due
to elevated temperatures. Failure
to follow this warning could result
in fire, personal injury, or death.
8
1
Determine boiler location
Installation & Operation Manual
Содержание KNIGHT 51
Страница 58: ...10 Start up Figure 10 2 Operating Instructions 58 Installation Operation Manual...
Страница 77: ...Installation Operation Manual Notes 77...
Страница 78: ...Installation Operation Manual Notes 78...
Страница 79: ...Installation Operation Manual Notes 79...