A2
L o c h i n v a r
D E S I G N E R
’
S
G U I D E
E F F I C I E N C Y
+
B O I L E R
6 1 5 - 8 8 9 - 8 9 0 0
PRESSURE
REDUCING VALVE
FULL PORT
BALL VALVE
RELIEF VALVE
CHECK VALVE
THREE WAY
VALVE
TEE
ELBOW
EXPANSION
TANK
TANK FITTING
SYSTEM PUMP
FOUR WAY
UNION
UNION
LOW WATER
CUT-OFF
AIR SEPARATOR
L E G E N D
This illustration is for concept only and should not be used for any actual installation without engineering
or technical advice from a licensed engineer. All necessary equipment may not be illustrated.
PIPING DIAGRAM
MULTIPLE UNIT PRIMARY / SECONDARY PIPING
12
”
MAX*
FROM SYSTEM
RETURN
TO SYSTEM SUPPLY
MAKE-UP WATER
CAP EACH MANIFOLD
LIT0475
*AS CLOSE AS PRACTICAL –
12
”
OR 4 PIPE DIAMETERS MAXIMUM
DISTANCE BETWEEN MANIFOLD
CONNECTIONS
TO SYSTEM.
Содержание EFFICIENCY PLUS
Страница 1: ...DESIGNER S GUIDE EFFICIENCY BOILER 1 5 0 0 0 0 3 0 0 0 0 0 B T U H R ...
Страница 26: ...28 L o c h i n v a r D E S I G N E R S G U I D E E F F I C I E N C Y B O I L E R 6 1 5 8 8 9 8 9 0 0 Notes ...
Страница 27: ......
Страница 28: ...Lochinvar Corporation 615 889 8900 Fax 615 547 1000 www Lochinvar com EB DG 03 4 5M 2 05 Printed in U S A ...