45
Installation & Service Manual
STEP
1
WITH 120 VAC POWER TO
APPLIANCE, TURN ON POWER
SWITCH, SWITCH LIGHTS UP?
120 VAC POWER TO UNIT?
NO
CHECK 120 VAC POWER SUPPLY.
NO
YES
CHECK WIRING TO SWITCH?
YES
CHECK 120 VAC THRU SWITCH?
NO
CHECK WIRING CONNECTIONS.
NO
REPLACE SWITCH.
YES
STEP
2
IGNITION CONTROL MODULE?
NO
NO
CHECK WIRING CONNECTIONS.
120 VAC MODULE?
YES
REPLACE MODULE.
YES
STEP
3
SET THERMOSTAT BELOW
WATER TEMPERATURE.
YES
STEP
4
SET THERMOSTAT TO CALL
FOR HEAT.
YES
STEP
5
COMBUSTION AIR BLOWER
(CAB) STARTS?
NO
AIR PROVING SWITCH OPEN?
NO
REPLACE SWITCH.
YES
CHECK FOR 120 VAC
AT CAB?
NO
CHECK WIRING CONNECTIONS.
YES
REPLACE CAB.
YES
STEP
6
NO
AIR SHUTTER ADJUSTMENT
CORRECT? SEE INSTRUCTIONS.
AIR PROVING SWITCH
CLOSES?
NO
ADJUST AIR SHUTTER TO
PROPER SET POINTS; CHECK
FOR AIR LEAKS FROM BURNER
COMPARTMENT / PRESSURE HOSE.
YES
IGNITION MODULE PURGE
"LED" LIGHTS UP?
NO
"LED" BURNED OUT BUT CONTROL
FUNCTIONS. REPLACE AT A
CONVENIENT TIME.
YES
REPLACE SWITCH.
YES
STEP
7
IGNITION MODULE IGNITER "LED"
LIGHTS UP & PURGE "LED" TURNS OFF?
YES
NO
"LED" BURNED OUT BUT CONTROL
FUNCTIONS. REPLACE AT A
CONVENIENT TIME.
STEP
8
NOTE: THIS CHART IS FOR
CONTINUOUS PUMPS ONLY.
SEE INSTALLATION INSTRUCTIONS
FOR INTERMITTENT PUMP AND
PUMP DELAY OPTIONS FOR
PUMP OPERATION.
NOTE: MUST OPEN WITHIN
45 SEC. AFTER CALL FOR
HEAT AND CLOSE WITHIN
5 MIN. AFTER CAB STARTS
OR MODULE LOCKS OUT.
TROUBLESHOOTING CHART
8
Troubleshooting
Содержание Efficiency-Pac EW 150 -- 300
Страница 47: ...47 Notes ...