background image

Category I double wall vent (or equivalent)
connectors and sized according to vent
sizing tables (FAN column) in the latest
edition of the 

National Fuel Gas Code

The Category I vent and accessories, such as
firestop spacers, thimbles, caps, etc., 

must

be installed in accordance with the vent
manufacturer’s listing. The vent connector and
firestop 

must

provide correct spacing to

combustible surfaces and seal to the vent
connector on the upper and lower sides of
each floor or ceiling through which the vent
connector passes.

Any improper operation of the common
venting system in an existing building should
be corrected when new equipment is
installed, so the installation conforms to the
latest edition of the 

National Fuel Gas Code,

ANSI Z223.1

When resizing any portion of the common
venting system, it should be resized to
approach the minimum size as determined
using the appropriate tables in the 

National

Fuel Gas Code

.

The weight of the venting system 

must

not

rest on the water heater. The venting system

must

be adequately supported in

compliance with local codes and other
applicable codes. 

Vent Terminations

The vent terminal should be vertical and
exhaust outside the building at least 2 feet
(0.6 m) above the highest point of the roof
when within a 10 foot (3.05 m) radius. 

Additionally, vertical terminations 

must

be a

minimum of 3 feet (0.9 m) above the roof
line, and when less than 10 feet (3.05 m)
from a parapet wall 

must

be a minimum of

2 feet (0.61 m) higher than the parapet wall.

Vent caps should have a minimum clearance
of 4 feet (1.2 m) horizontally from, and in no
case above or below [unless a 4 feet (1.2 m)
horizontal distance is maintained], electric
meters, gas meters, regulators and relief
equipment. 

Maintain a distance of at least 3 feet
(0.9 m) above any forced air inlet within 
10 feet (3.05 m) and a distance of at
least 4 feet (1.2 m) below, 4 feet (1.2 m)
horizontally from, or 1 foot (30 cm) above
any door, window or gravity air inlet.

Do not terminate the vent in a window well,
stairwell, alcove, courtyard or other recessed
area. 

The vent can not terminate

below grade

. The bottom of the vent

terminal shall be located at least 12 inches
(30 cm) above grade and clear of snow,
ice, leaves or other debris.

The distance of the vent terminal from
adjacent public walkways, adjacent
buildings, windows, and building openings

L o c h i n v a r

D E S I G N E R

S

G U I D E

C O P P E R

-

F I N

W A T E R

H E A T E R

6 1 5 - 8 8 9 - 8 9 0 0                      

7

Содержание Copper-Fin CW 495

Страница 1: ...DESIGNER S GUIDE COPPER FIN WATER HEATER 4 9 5 0 0 0 2 0 6 5 0 0 0 B t u h r...

Страница 2: ...d in a succinct easy to use manner so you can use and share information confidently and with minimal effort However it is important to remember that this guide is not intended to replace our installat...

Страница 3: ...FIG 2 Water Heater Equipment Control Orientation 4 FIG 3 6 Combustion Ventilation Air 5 6 FIG 7 Barometric Damper Installation 8 FIG 8 Multiple Unit Barometric Damper Installation 9 FIG 9 Outdoor Ven...

Страница 4: ...connections should leak water damage will not occur When such locations cannot be avoided it is recommended that a suitable drain pan adequately drained be installed under the unit The pan must not re...

Страница 5: ...istribution piping runs through the floor and beneath the appliance Ensure that combustible floor base meets local fire code requirements Outdoor models require the installation of an optional vent ca...

Страница 6: ...RMINAL STRIP HOT WATER OUTLET COLD WATER INLET BURNER INSPECTION PORT FRONT GAS CONNECTION HOT WATER OUTLET COLD WATER INLET BURNER INSPECTION PORT FRONT AIR INLET FRESH AIR INLET RIGHT SIDE FLUE PROD...

Страница 7: ...re If combustion and ventilation air is taken from the outdoors using a duct to deliver the air to the mechanical room each of the two openings should be sized based on a minimum free area of one squa...

Страница 8: ...ry I listed vent pipe Additionally it is recommended that this vent material be double wall construction or insulated in the field A Category I appliance operates with a non positive static vent press...

Страница 9: ...The vent terminal should be vertical and exhaust outside the building at least 2 feet 0 6 m above the highest point of the roof when within a 10 foot 3 05 m radius Additionally vertical terminations...

Страница 10: ...terial using the FAN category of vent sizing tables in the latest edition of the National Fuel Gas Code FAN applies to fan assisted combustion appliances in Category I Barometric Dampers A barometric...

Страница 11: ...a masonry chimney it is prudent to reline the chimney with a properly sized and approved chimney liner system Metallic liner systems Type B doublewall or flexible or rigid metallic liners are recomme...

Страница 12: ...onto the water heater Lochinvar must furnish an outdoor vent kit in accordance with CSA international requirements Each kit includes the flue outlet combustion air inlet assembly gasket and pump cove...

Страница 13: ...R H E AT E R 6 1 5 8 8 9 8 9 0 0 1 1 4 5 TABLE D GAS SUPPLY PIPE SIZING Length of Pipe In Straight Feet Nominal Iron Pipe Size Inches 10 20 30 40 50 60 70 80 90 100 125 150 175 200 369 256 205 174 155...

Страница 14: ...TANT To ensure proper velocity through the heat exchanger it is necessary to regulate the temperature rise across the heat exchanger from inlet to outlet This must be done on initial installation and...

Страница 15: ...ory installed as a low water cutoff device on models CW495 thru CW2066 The flow switch is installed in the outlet piping from the water heater and wired in series with the ignition system safety contr...

Страница 16: ...nvar NOTE When the unit is installed in Canada it must conform to the CAE C22 1 Canadian Electrical Code Part 1 and or local Electrical Codes NOTE Incorrect piping of the cold water supply to the syst...

Страница 17: ...RELIEF VALVE LOCK TEMP STORAGE TANK DRAIN FULL PORT BALL VALVE SYSTEM PUMP SYSTEM RELIEF VALVE TEE ELBOW UNION EXPANSION TANK CHECK VALVE THERMOMETER COLD WATER SUPPLY BUILDING RETURN INLET OUTLET LO...

Страница 18: ...OW UNION EXPANSION TANK CHECK VALVE THERMOMETER L E G E N D BUILDING HOT WATER SUPPLY LOCHINVAR WATER HEATER COLD WATER SUPPLY BUILDING RETURN LOCK TEMP STORAGE TANK RELIEF VALVE DRAIN OUTLET INLET LI...

Страница 19: ...LET RELIEF VALVE OUTLET COLD WATER SUPPLY 1400 F HOT WATER SUPPLY 1800 F HOT WATER SUPPLY LOCK TEMP STORAGE TANK LOCHINVAR WATER HEATER MIXING VALVE CHECK VALVE LIT0136 This illustration is for concep...

Страница 20: ...PPLY BUILDING HOT WATER SUPPLY LIT0138 This illustration is for concept only and should not be used for any actual installation without engineering or technical advice from a licensed engineer All nec...

Страница 21: ...SUPPLY LIT0451 THERMOMETER This illustration is for concept only and should not be used for any actual installation without engineering or technical advice from a licensed engineer All necessary equi...

Страница 22: ...S G U I D E C O P P E R F I N W A T E R H E AT E R 6 1 5 8 8 9 8 9 0 0 PIPING DIAGRAM MULTI STACK FRAME W WATER HEATERS AND STORAGE TANK LIT0396 Heater Heater Inlet Manifold Model Outlet Size Pipe Si...

Страница 23: ......

Страница 24: ...Lochinvar Corporation Lebanon TN 615 889 8900 Fax 615 547 1000 www Lochinvar com CW DG 05 Revised CW DG 05 1 07 4 09 Printed in U S A...

Отзывы: