3.3.3
Working clearances
For access to the appliance, it is recommended that the following clearances
are observed (see figure):
•
AA: around the appliance's control column and cleaning openings: 100 cm.
•
BB: all sides of the appliance: 50 cm.
•
Above the appliance (room to replace the anodes):
-
100 cm if using fixed anodes, or
-
50 cm if using flexible anodes.
If the available clearance is less than 100 cm, flexible magnesium anodes
may be ordered.
Comment
When installing the appliance, be aware that any leakage from the tank
and/or connections can cause damage to the immediate environment or floors
below the level of the boiler room. If this is the case, the appliance should be
installed above a wastewater drain or in a suitable metal leak tray.
The leak tray must have an appropriate wastewater drain and must be at least
5cm deep with a length and width at least 5cm greater than the diameter of the
appliance.
Working clearances
AA
AA
AA
BB
IMD-0275 R2
Содержание CHA 100 CE
Страница 4: ...4 Instruction manual CHA gis...
Страница 10: ...Introduction 10 Instruction manual CHA 1 gis...
Страница 32: ...Installation 32 Instruction manual CHA 3 is...
Страница 40: ...Conversion to a different gas category 40 Instruction manual CHA 4 is...
Страница 50: ...Starting the water heater 50 Instruction manual CHA 9 gis...
Страница 52: ...Shutting down 52 Instruction manual CHA 10 gis...
Страница 70: ...Electrical diagram 70 Instruction manual CHA 14 is...
Страница 72: ...Declaration of Conformity 72 Instruction manual CHA 15 is...
Страница 74: ...0310 569 1 0 UK Index Instruction manual CHA...