background image

5

LCN-GT10D

Installation guide 

Local Control Network

®

Connect  the  mounting  frame 
to the I-port and screw to the 
flush mounted box.

Pull  out  the  plastic  slider 
sideways  at  the  rear  side  of 
the  key-sensor  until  it  resists           
(about  8mm),  and  insert  the 
LCN-GT10D  at  a  slight  angle 
from  the  bottom  towards  the 
m o u n t i n g   f r a m e .   A t   t h e  
bottom area, the LCN-GT10D 
must  be  hooked  into  the 
c o r n e r s   o f   t h e   m o u n t i n g  
frame  and  pressed  towards 
the wall.

T h r o u g h   p u s h i n g   i n   t h e  
plastic  slider  on  the  side,  the 
LCN-GT10D  is  locked  firmly 
onto the mounting frame. 

   Insert guiding pins at an
    angle from the bottom

    engage to the bottom
    corners in a slanted 
    movement

press the LCN-GT4D                            
towards the wall, lock 
slides on the side

3.

 1.

2.

Содержание LCN-GT10D

Страница 1: ...be comfor tably operated even with a low environmental light Apart from that the bottom 6 keys D1 D6 are supplied with a blue background light Each of the 6 keys has an integrated status LED that can...

Страница 2: ...signed as follows X1 X4 work on the keys in the A table according to their numbers The bottom 6 sensor keys work on the D table of the module Further information can be found in the online help on the...

Страница 3: ...rts a language changing german english french spanish polish turkish russian and arabian that can be toggled during operation The appropriate command can be found in the LCN PRO The display texts for...

Страница 4: ...o guarantee a stable fixing and a flawless function of the LCN GT10D When Installing on Kaiser cavity wall flush mounted boxes the seperating strip must be removed from the middle of the box as this p...

Страница 5: ...0D at a slight angle from the bottom towards the mounting frame At the bottom area the LCN GT10D must be hooked into the corners of the mounting frame and pressed towards the wall Through pushing in t...

Страница 6: ...nstall the enclosed power supply LCN NUI in flush mounted box with the LCN UPx Simply loop the LCN NUI into the connection cable The power supply is given directly over the four pole I port extension...

Страница 7: ...ta wires are connected here from different pairs LCN IV IVH LCN IV IVH Data Data 5V Data Data 5V Mass N Data Data 5V Mass N Note about I Port extension on the LCN IV IVH wrong The data wires must not...

Страница 8: ...SI signals can be given out Operating the LCN IV as pulse counter counter input is not possible The power supply for the LCN GT10D must only be supplied from the LCN NUI or the optionally obtainable L...

Страница 9: ...for processing Semitransparent paper inlayer is even better for the optimum luminance of the LED s Inserting the inlay into the key sensor Pull the plastic slider at the rear of the key sensor to the...

Страница 10: ...LCN GT10D Installationsanleitung Geb udeleittechnik in Perfektion 10...

Страница 11: ...y max 80 rel non condensing usage stationary installation according to VDE632 VDE637 protection art IP20 dimensions 50mm x 22mm 110V 230V AC 15 50 60Hz Important note Despite its extensive functionali...

Страница 12: ...ona LED s controllable over command GT brightness functions OFF BLINKING FLICKERING ON the brightness is adjustable in steps key background LED s blue functions ON OFF display 2 8 71mm TFT colour disp...

Отзывы: