6 Commissioning
6.1
Starting the appliance the first time
Make sure that all of the instructions regarding positioning, air and electrical connections have been followed.
Figure 2: Start-up operations
Operations list to start the nitrogen generator the first time:
Connect the N2 outlet #1 (
3
)
Connect the N2 outlet #2 / Dry Air outlet (
if featured
4
)
Connect the condensate drain (
7
)
Connect power cable and switch ON the unit (
2
)
Set the working pressure (
see 8.1)
Adjust the pressure using the pressure regulator(s) (N2 outlet #1 and N2 outlet #2 / Dry Air outlet
if
featured
) (
5 – 6
)
The pressure gauges show the current outlet pressure
Start production pressing
START/STOP
or from the control screen (
1
)
(the display will show
WORKING
)
NOTE: The generator is setted by default to produce Nitrogen at a pressure of 7bar (101.5psi).
To change this setting see 8.1
6.2
Shutting down
List of operations to be performed before powering off the generator at the power switch:
Switch the generator
OFF
by pressing
START/STOP
or from the control screen
(1)
Wait until it will be completely still and depressurise
Unplug the power cable
(2)
6.3
Returning the appliance for service and/or repairs
List of operations to be performed before packaging the appliance and sending it to service:
Switch the generator
OFF
by pressing
START/STOP
or from the control screen
(1)
Wait until it will be completely stop and depressurise
Switch OFF the unit and unplug the power cable
(2)
Disconnect the nitrogen outlet tubing(s)
(3
and
4
)
Disconnect the condensate drain pipe
(7)
Place the generator in the original packing.
Operating manual NG(A) CASTORE XS iQ
17