The external sensor in placed as instructed below: 

Embedding in concrete

Place the sensor in a conduit approx. 2 meters 
into the room before embedding in concrete. Take 
into consideration that the placement is at a re-
presentative point for the area that is going to be 
adjusted. The end of the sensor is to be placed 
between two fl oor heating pipes. Seal the end of 
the conduit with tape or similar to prevent con-
crete from getting into the conduit. Try to place 
the conduit as high as possible since this gives 
a more optimal adjustment of the fl oor  surface 
temperature. The external sensor is slipped into 
the conduit before pouring the concrete and is 
connected to the room thermostat as instructed 
above. 

LK Wood 22, LK XPS or LK Silencio

Mill a slot on the upper side of the board. Place a 
conduit in the slot, end the conduit right between 
two heat distribution plates. Take into conside-
ration that the placement is at a representative 
point for the area that is going to be adjusted. The 
external sensor is slipped into the conduit befo-
re laying the fl oor and is connected to the room 
thermostat as instructed above. 

Floor heating in secondary spaced boarding

Place a conduit right between two heat distribu-
tion plates, attach the conduit on the edge of the 
secondary spaced boarding using a clip for con-
duits. Take into consideration that the placement 
is at a representative point for the area that is 
going to be adjusted. The external sensor is slip-
ped into the conduit before laying the fl oor and 
is connected to the room thermostat as instructed 
above. 

LK EPS 16

Place a conduit along the long sides of the fl oor 
heating installation facing the nearest short end. 
Saw an approx. 2 meters long slot in the EPS-
board and place the conduit in the slot. Take 
into consideration that the placement is at a re-
presentative point for the area that is going to be 
adjusted. The external sensor is slipped into the 
conduit before laying the fl oor and is connected 
to the room thermostat as instructed above. 

Connect the sensor as follows:

1. Remove the internal temperature sensor, as per 
the fi gure below:

2. Connect an external temperature sensor to ter-
minal 11 and 12 (refer to circuit diagram).

Actuator

3. The supplied cable can be extended to the max. 
cable length of approx. 50 metres. Use at least the 
same cable area as the sensors when laying. 

4. Avoid laying parallel (on cable runs) with po-
wer wiring.

Содержание Wired Room Control NC

Страница 1: ...ators are signalled via the connection box Settings requirements All distribution flows must be adjusted according to the installation guide for the unit The heat set tings for the control unit are regulated according to the requirements of the heat system and the cli mate zone A control zone consists of 1 LK Room Thermostat NC that can control one or more un der floor heating areas each equipped ...

Страница 2: ...ure is to be ad justed Remote switching The LK Control is a complete unit for outdoor tem perature dependent flow temperature control and adapted for LK s shunt programs If LK Control is used then the volt free pump relay of LK Connec tion box can be connected to LK Control connec tions M and H1 By connecting LK Connection box to the LK Control gives the function that when all actuators on the man...

Страница 3: ...d is connected to the room thermostat as instructed above Floor heating in secondary spaced boarding Place a conduit right between two heat distribu tion plates attach the conduit on the edge of the secondary spaced boarding using a clip for con duits Take into consideration that the placement is at a representative point for the area that is going to be adjusted The external sensor is slip ped in...

Страница 4: ...ong sides of the floor heating installation facing the nearest short end Place the conduit at the short end between two heating pipes and end it approx 2 meters in Seal the end of the conduit with tape or similar to pre vent concrete from getting into the conduit The external sensor is slipped into the conduit before pouring the concrete and is connected to the room thermostat as instructed above ...

Страница 5: ...ectric connections LK Connection Box NC L N zone 2 zone 5 1 4 zone 4 2 1 1 4 zone 1 6 2 4 2 1 7 4 1 zone 2 2 4 zone 1 2 3 zone 2 1 8 4 1 zone 4 4 2 200 mAT 4 A pot free 200 mAt 4 A pot free N L N L zone1 2 4 1 230 V 24 V 40 VA Transformer 98927 2 1 4 ZONE 1 ZONE 2 ZONE 2 ZONE 1 2 1 98927 2 1 4 1 2 1 7 2 3 4 5 6 7 9 11 10 8 Sample connections for a zone Terminal 1 9 on the room thermostat is connec...

Страница 6: ...6 English Wiring with LK Shunt LK Zone Valve and Time Switch if req d LK Connection Box with LK Shunt and LK 2 port Zone Valve 10 Mar 06 EN 33 C 28 0904 Assembly instructions LK Wired Room Control NC ...

Отзывы: