7.2
Commission
Before commissioning the inverter, make sure:
•
The country mark on the box is in accordance with the installation site;
•
The inverter is correctly and firmly mounted;
•
The Circuit breaker and RCD are correctly connected and are all in “off”
position;
•
All cables are connected according to chapter 6;
•
Unused inputs must be sealed using the corresponding connectors or
sealing plugs.
Procedure:
STEP 1: Power on the Grid
•
Wait for a while, the green led should be glowing and the graphical
display should start displaying. Item “L”, “M”, “N”, should appear on
the screen. If not, please power off and check for the connections of
grid power line and smart meter.
STEP 2: Power on the Battery
•
The battery icon and its parameters should be shown on the screen. If
the SOC of the battery is greater than 10%, the blue LEDs should also
be turned on to indicate the SOC.
STEP 3: Power on the PV
•
I
f there’s sunlight, the PV icon and i
ts parameters should be shown on
the screen.
•
Wait for a moment and the inverter will start a self-test procedure.
When it is done successfully, the inverter will start using PV power to
charge the battery or feed in power to the house and grid.
STEP 4: Switch on the loads
•
The load parameters should show.
STEP 5: Configure the WiFi stick
•
Configure the WiFi stick for remote monitoring. Please follow the
instructions manual in the WiFi stick’s box.
Otherwise, please contact
Содержание Hyper 2000
Страница 1: ...Operating Manual Low Voltage Hyper Series Version HYPER LV 1P AU 1 14...
Страница 2: ......
Страница 7: ...4 3 Scope of Delivery A B C D E F 1 2 3 4 5 6 7 8 G H I J K L M...